The wall tiles of the toilet are going to fall off, and they are ready to be reworked and repasted,

Updated on Toilets 2024-07-22
5 answers
  1. Anonymous users2024-01-24

    Bottoming and leveling, row bricks (pasted from top to bottom, half bricks in the lower and yin corners), elastic line, inlay (turned).

  2. Anonymous users2024-01-23

    Did you do it? It's very tiring and troublesome, first, remove the old tiles, clean the wall, and chisel the wall with sharp things on the wall. Second, soak the tiles with water, and cement. Third, plaster cement around the back of the tile, and you can paste the tile!

  3. Anonymous users2024-01-22

    First of all, remove the old tiles, clean the wall, and chisel the wall with a sharp thing on the wall. Then soak the tiles with water, and cement. Step 1:

    Fill the soaked tiles with a full batch of cement, and be full. Step 2: Stick the bricks with a full batch of cement along the pallet and beat them with a rubber hammer.

    Step 3: After knocking it flat, take it down, see where there is a pulp, and fill it up. Step 4:

    After filling the area that is not full, sprinkle plain cement (pure cement), stick it to the wall again, stick it flat, and beat it firmly with a rubber hammer. Step 5: Because the cement always has to slide, after pasting, it must be filled again with mortar.

    Step 6: In order to paste the wall tiles (neat brick joints) smoothly and regularly, in the process of pasting, insert toothpicks or thin iron nails into the brick joints, and wait until the cement is solidified, and then take it out; Hehe, the bricks will be firm and smooth according to this pasting.

  4. Anonymous users2024-01-21

    It's better not to make it yourself, the bathroom has a lot of water, and it won't be sturdy if you make it yourself.

  5. Anonymous users2024-01-20

    Base treatment: elastic line, pre-paving, paving, hook and seam cleaning.

    Construction technology: Before laying, a mold should be made to select bricks, and the tiles that meet the requirements of the large size deviation should be selected and used in the corners or non-whole bricks. (1) Base treatment: clean the dust and debris thoroughly, and there shall be no defects such as hollowing, cracking and sanding.

    2) Spring line: Before construction, the elevation control line will pop up around the wall, and the cross line will be popped up on the ground to control the size of the floor tile separation.

    3) Pre-paving: First of all, on the basis of the design requirements of the drawings, the color, texture, surface smoothness and other strict selection of the floor tiles, and then pre-paving according to the requirements of the drawings. Adjust and exchange the size, color, and texture errors that may occur in the pre-paving until the best effect is achieved, and stack them neatly and neatly according to the paving.

    4) Paving: 1:3 dry hard cement mortar is used for laying, and the thickness of the mortar is about 25mm.

    Before paving, the back of the floor tile should be moistened, and the front should be dry. Put the floor tiles on the cement mortar according to the requirements, and tap the floor tile finish with a rubber hammer until it is dense and flat to meet the requirements.

    5) Joints: 24h after the floor tiles are paved, the joints should be cleaned up before the joints, and the impurities in the gaps of the floor tiles should be wiped off before the joints, and the joints should be hooked with special caulk.

    6) Cleaning: During the construction process, it is cleaned with drying, and the surface of the floor tiles is cleaned up with cotton yarn and other materials after completion (generally after 24 hours).

    Laying of wall tiles:

    1: When the base layer is treated, all kinds of dirt on the wall should be cleaned up, and watered and moistened one day in advance. If the base layer is a new wall, when the cement mortar is dry, it should be arranged with bricks, elastic lines, and adhesive wall tiles.

    2: The tile must be soaked in clean water for more than 2 hours before pasting, and the brick body shall not bubble, and then take it out to dry and set aside.

    3: When laying and sticking, when encountering pipelines, switches, supporting parts of toilet equipment, etc., they must be cut and matched with a whole brick set, and it is forbidden to use non-whole bricks to patchwork and paste. If you have more questions, you can click on ID to consult.

Related questions
9 answers2024-07-22

1. Add ceramic cement to clean water (water-cement ratio is 1:4), and it is recommended to use mechanical stirring for better effect. Let stand for 5-10 minutes to cook and recycle before use, and stir again before use to increase the strength. >>>More

2 answers2024-07-22

You don't need to go to the top, because you also have to hang the ceiling, and there is some space on it.

1 answers2024-07-22

The cost of this renovation will probably be composed of the following aspects: the cost of smashing bricks, the cost of wall base treatment, the cost of waterproof materials and construction, the cost of water circuit renovation, and the cost of tiling (there may also be the cost of garbage removal, depending on the regulations of the construction party and the property). >>>More

3 answers2024-07-22

From the outside, there is no problem, it can only be said that there is no bloodshed, and there is no hole in the head, so who can guarantee that there is no problem now, so who will you turn to if there is a problem in the future? I'd rather smash a hole in the head and bleed, and I don't want to leave sequelae if there is any situation inside, the situation is even more serious, you should find the relevant departments to deal with this matter, today is your disaster, then tomorrow no one knows what else will fall down, go to the management department of the factory to find them to claim, this is a must.

2 answers2024-07-22

There will definitely be traces, but it will not be too obvious It is recommended to communicate with the upstairs If you have not finished the decoration, then re-do the waterproofing in case of future troubles You can also wait for the dry after the tile joint with glass glue to wipe it again It can also be solved.