The bathroom waterproofing is done, and I just tested the water and found that there was a little le

Updated on Bathroom 2024-07-04
7 answers
  1. Anonymous users2024-01-24

    Workarounds for different causes.

    1. The waterproof layer is leaking.

    If the waterproof layer is leaking, the original tile should be knocked off for base cleaning, and then the cement mortar should be adjusted and applied to the ground for waterproofing. However, the height of the waterproof wall should be controlled at about 30cm, not too high or too low, so as not to affect the waterproof effect.

    2. The waterproof layer of the bathroom is leaking.

    If the waterproof layer of the bathroom is leaking, you can not knock on the tiles, as long as the new penetrating waterproofing agent is used to apply on the surface of the bathroom, so that the water does not enter the ground and flows directly from the waterway, so as to play the role of waterproofing and filling the leakage.

    3. Leakage of upper and lower water pipes.

    If the upper and lower pipes are leaking and the pipes are underground, remove the tiles to repair or replace the leaking pipes. If it is a leak in the sewer pipe, it is necessary to find the specific location of the leakage, and then determine the scope of the brick knocking according to the situation, and it is not necessary to knock all of them open.

    4. The ceiling is moisture-proof.

    The environment of the bathroom is relatively humid, and the ceiling will often be surrounded by water vapor, so when repairing, it is necessary to consider replacing the ceiling with a waterproof PVC gusset, and then install it on the keel to cover the pipe, which is not only beautiful but also has the effect of rejuvenation.

    5. Leakage of water pipes on the ground.

    If the water pipe on the ground is leaking, the floor tile should be cut open first, and then the leaking water pipe should be found, and then sealed with a product. If there is a crack in the water pipe itself, the water pipe should be replaced, and after treatment, the water pipe should be buried again, the waterproof layer in the area should be repaired, and the floor tiles should be restored.

    Second, what are the key points of construction in the waterproof construction of the bathroom.

    1. Before construction, it is necessary to ensure that the ground is on a slope, if the ground does not maintain a sufficient slope, the water will not flow smoothly into the sewer, and it is easy to accumulate water. If the floor is to be renovated, it should be leveled with cement mortar before waterproofing can begin.

    2. In order to prevent the leakage of the root of the pipeline, Jianzen frankly discussed that waterproof reinforcement measures must be taken at the groove inside the pipeline, and it is also necessary to paint the waterproof material will be of better quality, and it is recommended to choose a high-quality waterproof coating will be better.

    3. When the wall is painted with waterproof coating, the painting height must be kept at about 30 cm, if the wall belongs to the non-load-bearing wall, it is necessary to brush the waterproof material on the whole wall, and then do a closed water test after painting to determine whether the waterproof layer construction is qualified. Remind everyone that when making waterproof coatings in the bathroom, you must ask professional construction personnel to operate, and do not carry out construction without authorization, otherwise the construction progress will be affected in the later stage, and there will be water leakage.

  2. Anonymous users2024-01-23

    Use the leak to stop repairing, the hotel bathroom leakage is repaired with it, bought on Taobao, with the kind of emulsion, better than its glue, the construction is simple and directly poured on the tile joint, it will seep into the interior to block well, you can try it.

  3. Anonymous users2024-01-22

    It's very simple, there are waterproof materials at home, and then brush it off after the leakage is dry, or you can find a waterproof master to deal with it. It's actually not that hard to do waterproofing.

  4. Anonymous users2024-01-21

    It should be waterproofed again until it is not leaking.

  5. Anonymous users2024-01-20

    Brush again with polyurethane to reach more than two millimeters and never leak.

  6. Anonymous users2024-01-19

    Find a waterproofing master and let him handle it for you!

    Regular waterproofing will give you the handling by all means.

    Hefei Laoyang waterproof is at your service.

  7. Anonymous users2024-01-18

    Just find the leak and fill it, and then test the water.

Related questions
1 answers2024-07-04

If it is professionally waterproof, after soaking for a week without seeping water, then you don't have to worry about it. Generally, after soaking in water for 30 minutes, there is no water seepage, and it is basically fine.

4 answers2024-07-04

After 18 hours of water testing, the water level drops by 2mm, which indicates that the waterproof is not done well and there is a leakage. The purpose of doing the "water test experiment" for 48 hours is to test whether the waterproofing is done well: if there is a decrease in water, it is not done well; If not, it means that the waterproofing is in place. >>>More

3 answers2024-07-04

Dig the best permeable waterproofing can be done by yourself. >>>More

1 answers2024-07-04

Capillary phenomenon, it should be that the waterproof layer is too absorbent, and its impermeability should not be good, whether the material is wrong or there is a problem with the construction.

1 answers2024-07-04

The waterproofing is not done well, or when testing the water, the water is too full, beyond the waterproofing, the wall is dry, the water vapor is absorbed, and the wall is wet, and the concrete will absorb water after six months of solidification.