Kitchen, balcony must be waterproofed floor

Updated on Kitchen 2024-07-21
1 answers
  1. Anonymous users2024-01-24

    The kitchen and balcony are a must to be waterproofed.

    First of all, we need to know why we need to redo waterproofing?

    1. You don't know whether the waterproof material for commercial use is qualified and whether it is constructed according to the standard, so there is no guarantee for the waterproof period.

    2. In the later stage of decoration, the original waterproof layer will be destroyed by hydropower transformation, so it needs to be re-waterproofed.

    Waterproofing of the kitchen The ground is all waterproof, the wall is more than 30 cm high, and the waterproof of the water area, such as the dishwasher, shall not be lower than the water range.

    Open balconies, waterproofing of terraces, roofing: It is necessary to construct flexible waterproofing + mortar waterproofing together. The base layer is covered with a flexible waterproofing coating (e.g

    K11 waterproof slurry flexibility), after the waterproof coating is dry, a layer of mortar waterproof layer is made on top as protection.

    Note: After waterproofing, it needs to be sprinkled with water for maintenance, and the direct sun should be covered with something.

Related questions
2 answers2024-07-21

If you are using water on the balcony for a long time, you must do it waterproof.

2 answers2024-07-21

I think there are also unsealed.

1 answers2024-07-21

This resolutely does not work, you must wait for the waterproof layer to completely dry, and then carry out a closed water test to ensure that there is no leakage, before you can start tiling, and in the process of tiling, you must ensure that there is no damage to the waterproof layer. The so-called closed water test refers to the toilet waterproof layer is completed and dry, the floor drain on the bathroom floor, the nozzle and other drainable pipes are sealed with tape to ensure that there will be no water leakage, and the water surface of the bathroom begins to release water, the height of the control principle is that the water surface must be higher than the upper mouth surface of the floor drain and must ensure that the floor of the bathroom can be immersed in water, so that you can see whether there is a leakage problem in the bathroom downstairs, and the water storage time is at least 24 hours or more.

2 answers2024-07-21

This is to be done.

If there is open water flowing to the ground from the balcony, or if the water is splashed on the ground when using ......It will seep down, even if the cement mortar is mixed with waterproofing agent when the bricks are pasted, it is useless, and the leakage should still leak down, especially in the corners. >>>More

5 answers2024-07-21

The document does not stipulate that it must be done, but it can not be done, and it is an extra layer of safety and security, that is, to spend more money to buy a peace of mind, and it is nothing if you don't do it, just pay attention to it when using water in the kitchen in the future. Sometimes you can just sprinkle a little bit and mop it dry with a mop in time, and close the valve tightly when you have to go out on a business trip or when there is no one at home.