The developer promised that the bathroom had windows, but now it doesn t, is it a breach of contract

Updated on Bathroom 2024-07-21
2 answers
  1. Anonymous users2024-01-24

    If such a problem is not clearly written in the contract, it can only be resolved through negotiation.

  2. Anonymous users2024-01-23

    Hello, we are a restoration house, there is a bathroom in the planning drawing, the west bathroom is in the middle of the house, there is no exhaust pipe, find builders and developers, they don't even answer the phone now, what should I do.

Related questions
1 answers2024-07-21

There must be responsibility, because this must be reserved, otherwise the bathroom can only be raised for drainage, which is not good for the whole house, and it is very difficult to use in life, and complaints must be made. There is also a situation that the developer originally made the main bathroom into a balcony in order to cope with the fire pass, and there was no way without caissons.

3 answers2024-07-21

Before the wall tiles are pasted, quickly treat the waterproofing facilities before laying the underfloor heating and water pipes.

1 answers2024-07-21

In this case, you should consult the developer for your opinion - it is impossible for you to encounter such a situation yourself, there should be a unified arrangement!

3 answers2024-07-21

This can be changed to a special switch for bath bombs, and the bath bomb circuit needs to be re-laid with control lines. If you want to share the power incoming line, you need to consider whether the cross-sectional area of the incoming line can match the power of the bath bomb, if the wire diameter is small, you just need to lay the power cable of the bath bomb circuit separately, and the grounding wire must be used.

2 answers2024-07-21

The sunken bathroom backfill is also backfilled by the owner himself after connecting the pipes during the renovation. The developer is not responsible for this backfill.