floors, cabinets, wardrobes and suspended ceilings in order. First the floor, then the ceiling, and

Updated on Suspended ceilings 2024-07-01
5 answers
  1. Anonymous users2024-01-24

    If this is the case for you, you should first hang the ceiling, install the doors, then install the floor, and then install the cabinets and wardrobes. Generally, the wardrobe is installed first and then the floor is laid, which can also save the floor, and the floor is not easy to be scratched, especially the solid wood floor. But you are like this now, you only have to lay the floor first, and there is nothing wrong with laying the floor first, it may involve the problem of load-bearing, but I personally think that the problem is not big.

    But in these links, you have to communicate with the master about your needs, so that the master can do all these things well.

    Suspended ceilings, doors, floors, cabinets, wardrobes. Suspended ceiling doors can be carried out at the same time, cabinets, wardrobes can be carried out at the same time.

  2. Anonymous users2024-01-23

    You'd better make the cabinets first, because the cabinets are to be designed if you make something else. At that time, the water and electricity will be difficult to get, and it will have to be reinstalled, which is time-consuming, laborious and costly.

  3. Anonymous users2024-01-22

    First the ceiling, then the wardrobe and cabinets, and finally the floor, otherwise the floor will be scratched, most of the installers in China are barbaric construction, and I have learned a painful lesson.

  4. Anonymous users2024-01-21

    Let the cabinet designer first determine the location of the socket pipeline or something, the floor and wall tiles must be done first, and then the size of the home cabinet.

    As long as it is paved, it does not affect the furniture.

    Suspended ceilings first, cabinets later. Above.

  5. Anonymous users2024-01-20

    First the ceiling and then the cabinets, the first door is laid on the wooden floor, your room is a solid wood floor, the living room is laminate flooring, the thickness of the two floors is the same, and the seams have a drop.

Related questions
3 answers2024-07-01

Suspended ceilingsFlooring, wardrobes, and ceilings are easy to damage when they are installed. After the floor is done, install the wardrobe. You don't have to worry about stopping alignment when you do it. The wardrobe is finally installed on the floor. Save time, save labor, and fast!

1 answers2024-07-01

Hello, you can install the anti-theft door first, and the decoration ground elevation is left in advance The inner door cover is directly connected with the door frame of the anti-theft door when decorating, and the threshold of the anti-theft door is not very good? As long as it is level with the interior, it doesn't matter if it is a little higher Because if you use floor tiles after entering the door, these height differences can be completely digested Now there are two keys to the security door, one of which is the decoration key, as long as the decoration is completed, you use the official key after the decoration key will automatically become invalid

5 answers2024-07-01

The cabinet should be the first, then the ceiling, and finally the pumping machine and the stove, but the size of the pumping machine and the stove should be determined in advance, otherwise the size of the cabinet can not be determined.

1 answers2024-07-01

Order: suspended ceiling, painter, door, floor (wooden), if floor tiles are used in front of the door.

1 answers2024-07-01

Step 1: Change to hydropower. The water and electricity at the time of delivery will be different from your own requirements, so you need to modify it. >>>More