Construction of the toilet Most of the construction of the toilet on the first floor is to backfill

Updated on Bathroom 2024-07-11
1 answers
  1. Anonymous users2024-01-24

    It may be much more convenient to renovate the rear, but the same Party B will definitely spend a lot of effort during construction. You can consider burying the pipes of the bathroom when building the building, and it is easy to leak after punching holes.

Related questions
1 answers2024-07-11

Definitely, the bare pipes are not beautiful, and it is a common practice to cover them with suspended ceilings!

1 answers2024-07-11

1 It all means that your room is too damp, this kind of mollusk from the elephant snot, some people call it slug, as long as you use table salt to kill them. It is best to seal the gap with glass glue, and keep the room dry and it will not regenerate.

3 answers2024-07-11

1.See if you have the ability or basic knowledge of this area; >>>More

1 answers2024-07-11

The construction unit shall rectify or repair the construction unit caused by non-standard construction. The warranty period has expired, so I have to find someone to dredge and pay.

6 answers2024-07-11

Disassemble or replace the leaking pipe, and connect it directly after applying it with PVC special glue, and using raw material tape and black tape can not prevent water leakage. If the leakage is not very serious, it is okay to apply glass glue on the outside of the pipe or in the leaky area, but the premise is that when applying glass glue, the tube must be dry and kept for at least 12 hours.