What preparations should be made before waterproofing the kitchen and bathroom?

Updated on Kitchen 2024-07-15
3 answers
  1. Anonymous users2024-01-24

    Clean up the base surface, construction waterproof materials and treatment details, more information, better suggestions, free concrete waterproof leakage repair technical advice, free repair today, tomorrow leakage, annual repair, annual leakage troubles.

  2. Anonymous users2024-01-23

    1.The new house is generally modified first, and then you can buy waterproof materials for waterproofing.

    2. The old house needs you to treat the original walls and floors, and the bricks need to be knocked out before they can be waterproofed.

  3. Anonymous users2024-01-22

    Before the bathroom is waterproofed, every procedure must be done!

Related questions
1 answers2024-07-15

It is necessary to arrange the hot and cold water pipes, followed by reserving the location of the grit tank, and the most important thing is to brush more waterproof paint in the later stage

1 answers2024-07-15

Now that the water pipes should be in place, you can start laying wall and floor tiles.

8 answers2024-07-15

Generally, it is made of waterproofing and then floor heating. It would be better if you could do it again after the underfloor heating.

2 answers2024-07-15

Yes, you have to wait for it to dry before doing it, and the surface should also be cleaned, remember that the shower room is waterproof at least meters.

2 answers2024-07-15

The kitchen does not need to be waterproofed, and the bathroom floor and wall need to be waterproofed