After the bathroom floor tiles are pasted, can you still install the water strip?

Updated on Bathroom 2024-07-31
2 answers
  1. Anonymous users2024-01-24

    Yes, directly paste the waterproof strip of stone or other materials on the floor tile, and close it with glass glue around the wall after pasting

  2. Anonymous users2024-01-23

    If you can, draw the line first, and then place the iron reserved hole according to the distance, or pour the cement directly. Make prefabricated panels with wooden squares in advance.

    Strip construction is very simple. Draw the line, which is one circle larger than the shower curtain. Paste along the line. Glass glue, tile glue, marble glue are all available.

    Do a good job of cleaning up after construction.

Related questions
7 answers2024-07-31

1) Take out the pipe plug of the ground drain outlet, check whether there is any debris in the pipe, and then clean the pipe nozzle. >>>More

1 answers2024-07-31

I can do waterproofing! The next time you do waterproofing, you can directly pry open the tiles and discharge the stagnant water from the caisson to do waterproofing again! Hope it helps!

1 answers2024-07-31

Check whether the color of the wall has changed, or whether the wall has peeled.

5 answers2024-07-31

The closed water test that can be done again has no effect on the waterproof layer, it was originally to test the waterproof layer, if there is a problem, it can only mean that the waterproof layer has a problem, not because of the closed water test.

5 answers2024-07-31

Hello. The bathroom is waterproof before the floor tiles, and then the water is released to measure leakage, and the time is 24 hours. If there is no leakage and start laying the floor tiles, there is no need to do a closed water test after the floor tiles are laid.