Decoration kitchen ceiling water heater installation which first

Updated on Kitchen 2024-07-12
3 answers
  1. Anonymous users2024-01-24

    Definitely the ceiling first, then the cabinets, and finally the water heater.

  2. Anonymous users2024-01-23

    The water heater should be installed first, then the ceiling, and the kitchen cabinet.

  3. Anonymous users2024-01-22

    Reserve eyes, renovate kitchens, water heaters.

Related questions
1 answers2024-07-12

If the height of the bathroom is very low and you want to put the water heater in the shed, press the water heater first. >>>More

2 answers2024-07-12

As long as the position under your ceiling reaches meters, you can install the water heater under the ceiling, which is safe, convenient and beautiful.

2 answers2024-07-12

If the ceiling is a gusset, it doesn't matter if it is installed first and then installed; If it is gypsum board or wooden ceiling, then you need to install a water heater first! Best wishes!

3 answers2024-07-12

Install the ceiling first.

It is very convenient to install the ceiling decoration master first, but it is easy to affect the installation of the water heater, because the ceiling installation generally needs to reserve a position, this position is generally not just right, the reserved space is large, it will affect the overall beauty of the ceiling, the reservation is small, the water heater construction also needs to cut a step, sometimes he will overcharge the owner for no reason, it is really not worth it. >>>More

1 answers2024-07-12

It is best to install the water heater with a higher installation height first, and do the ceiling, so that the ceiling can be modified according to the space occupied by the water heater to fix the relevant dimensions of the keel and the gusset, such as the water heater is embedded in the ceiling, and it is best to reserve maintenance space and inspection port.