There are many hollow drums in the bathroom, and after removing it, it is found that the bricks do n

Updated on Bathroom 2024-07-15
2 answers
  1. Anonymous users2024-01-24

    After the wall is built, there is no batch of a layer of interface agent and a layer of interface agent for mesh cloth, and then there will be no empty valley if you use tile adhesive to paste tiles.

  2. Anonymous users2024-01-23

    At that time, the bricks were not painted with mortar when they were pasted.

Related questions
3 answers2024-07-15

Turn it at a 90° angle to take it down.

1 answers2024-07-15

Depending on what the top is, some of them seem to be able to go straight up, and some of them need to be taken off first.

3 answers2024-07-15

The bathroom has integrated lights, barrel lights, warm lights, generally mostly integrated lights, there are heating exhausts, if this is the case, the light panel is stuck on, you take a closer look, only take the light panel and change the lamp tube after the card on the line, the barrel light is much simpler, remember that you must first pull down the total tie.

7 answers2024-07-15

Rotate the middle lampshade and take it off to see the bulb, change it!

1 answers2024-07-15

I went up and took off the lampshade, and the button inside came down.