What are the routine inspections of environmental protection of factory toilet drainage?

Updated on Bathroom 2024-07-25
1 answers
  1. Anonymous users2024-01-24

    Domestic sewage is directly handed over to the municipal government for treatment, and there are usually PH value, ammonia nitrogen, COD, etc.

Related questions
8 answers2024-07-25

For the bathroom to do the same floor drainage, I think this decoration method is very good. First of all, the biggest advantage of doing the same floor drainage is that the noise of the drainage in the later stage is basically 0, that is to say, we can no longer hear the sound of the upper floor draining at home. >>>More

3 answers2024-07-25

Last year, the basement of my house was also like this, after many explorations, I found a product called sewage lifter, it is a container, there is a small water pump in it, all the sewage is connected to the container, there is an inlet and outlet on the container, the outlet is connected to the pipe and discharged to the outdoor sewage well or sewage pipe, the small pump inducts water into the container and will automatically drain the water, overall it is relatively good. >>>More

1 answers2024-07-25

Buy a tube with flaring and straight-through, a bottle of glue, and ask a water master to help pick it up, the process is a little troublesome, and it takes experience and technical cooperation to replace it.

1 answers2024-07-25

Eco-friendly toilets are generally used in parks, urban areas, or tourist attractions. You may have seen a lot of it, but you don't know the specific name, or it is mostly called "mobile toilet". This kind of toilet is mainly made of partition walls, which are divided into male and female toilets, and its structure is simple, convenient and practical. >>>More

9 answers2024-07-25

The toilet sewage inspection port can be sealed after the renovation is completed, and it must be sealed after the decoration is completed, for insurance. The toilet sewage inspection port is equipped with an openable inspection cover and is installed on the drainage riser and the long transverse pipe section for inspection and clearance. The inspection port is generally installed in the riser, for the connection between the riser and the transverse branch pipe when there is a foreign body blockage, and the drainage riser of multi-storey or high-rise buildings should be installed every other layer, and the spacing between the inspection ports is not more than 10m. >>>More