Can the ceiling conversion layer screw be welded to the angle steel?

Updated on Suspended ceilings 2024-07-24
1 answers
  1. Anonymous users2024-01-24

    The ceiling conversion layer refers to the reverse support. According to the provisions of the "Code for Acceptance of Construction Quality of Building Decoration and Decoration Engineering", the distance between the boom and the end of the main keel is not more than 300mm, and when it is greater than 300mm, the boom should be added. When the length of the boom is larger, the counter-support should be set.

    When the boom meets the equipment, the boom should be adjusted and added. It is also stipulated that it is applicable to the conversion layer structure that needs to be connected after more than 3 m.

    The function of the reverse support is mainly to control the upward movement of the ceiling panel when negative wind pressure is generated in the room. When the plate surface is subjected to wind load, the plate surface will float up and down, and the boom is usually made of 6 10 steel bars, which can control the downward movement of the plate face, but cannot control the upward movement of the plate face. The reverse brace can support the plate surface and prevent the plate surface from moving upward, so as to control the deformation of the plate surface.

Related questions
2 answers2024-07-24

The carpentry union does, and the accessories are matched when buying the boom.

9 answers2024-07-24

Conversion layer: the performance hall, the weight of which is used in the general tooling to the wire light steel keel can not bear, larger indoor activity venues, etc., must have. It is mainly used in large concert halls, as well as in later equipment maintenance, etc. >>>More

1 answers2024-07-24

This still needs to be treated with anti-corrosion, otherwise if the solder joint is corroded by moisture, it may cause it to fall off after receiving external force, and the ceiling will collapse.

1 answers2024-07-24

The conversion layer is generally used for the space where the original top surface of the ceiling and the ceiling surface are far apart. Normally, if it's more than 1500, the conversion layer is used. >>>More

7 answers2024-07-24

GB50201-2001 "Code for Quality Acceptance of Building Decoration and Decoration Engineering" clearly stipulates that when the length of the boom exceeds meters, a counter-support should be set. It seems that it cannot be directly hung with a screw rod.