Decoration sequence: Home Decoration , plumbing, carpenter, door, ceiling, floor, stucco wall, etc

Updated on Suspended ceilings 2024-07-29
4 answers
  1. Anonymous users2024-01-24

    Hydropower, pipelines, water and water supply arrangement.

    Bathroom waterproofing, carpentry, wall decoration.

    Bricklayer floor decoration.

    Canopy decoration. Painter.

    Installation of lamps and sanitary ware.

    Carpentry doors, suspended ceilings, floors, stucco walls.

  2. Anonymous users2024-01-23

    Hydropower renovation (water pipe pressure detection) Sixth, toilets and kitchens are waterproofed.

    7. Wall and floor tiles and threshold stones, bay window countertops, sealing pipes, wall whitewashing, etc. (the integrated ceiling between the whole cabinet, bathroom and kitchen can be measured

  3. Anonymous users2024-01-22

    Hydropower – demolition and alteration – bricklayer (or carpenter) – carpenter (or bricklayer) – oilman.

  4. Anonymous users2024-01-21

    Plumbing - Flooring - Powder wall - Carpentry (doors, sanitary ware, cabinets, stoves) - Ceilings - Installing doors, sanitary ware, cabinets, stoves - lamps.

Related questions
2 answers2024-07-29

It's better to close the balcony first, and now if you install an automatic drying rack, you know how to install it later.

1 answers2024-07-29

If these cabinets are fixed on the wall, then make it first and fix it to the wall, and the back of the cabinet does not need to be putty and latex paint. If the cabinet is movable, the wall behind the cabinet needs to be putty and latex painted.

4 answers2024-07-29

Renovation is a very complex project, so let's take a look at the order of decoration. >>>More

1 answers2024-07-29

First modify the water and electricity, then lay the floor, then carpenter the decoration and paint, and finally install the lamps and lanterns!

1 answers2024-07-29

Before laying the pipe, it is necessary to groove, bury the pipe, seal it flat, and do waterproofing after pressurization. Generally do.