The toilet tiles were paved, but I found that the slope was not good. Is it to re tile or to make a

Updated on Toilets 2024-07-23
4 answers
  1. Anonymous users2024-01-24

    What is the design of the door? If the water will go out of the door, rebuild the bricks. The level of this renovation worker is too poor.

  2. Anonymous users2024-01-23

    It's still a good one-time solution to repave without worry.

  3. Anonymous users2024-01-22

    To re-tile, you need to do waterproofing. No way. If you don't spread the water to the living room, you will be troublesome.

  4. Anonymous users2024-01-21

    To re-tile, you need to do waterproofing. Deduct the master's salary!

Related questions
1 answers2024-07-23

OK! It's a must!

It is their responsibility to conscientiously construct and protect the safety of all property of Party A. >>>More

3 answers2024-07-23

You can find a water pipe or brick inlay master to see if he can fix it for you.

1 answers2024-07-23

Hello! Depending on your situation, it's the sound of the wind coming in along the air duct outside. It is recommended that you install a flap valve at the outside air duct opening. Let the outside wind and rats not get in, but the inside wind can go out. This kind of flap valve is generally installed on the oil flue.

8 answers2024-07-23

If there is no problem with a little higher, the living room is just leveled with composite flooring, but if the height gap is relatively large, it is not very good, it is best not to exceed 3 cm, if the gap is large, you can only wipe the floor of the living room with cement mortar, narrow the gap and then lay the floor, or use a solid wood floor, hit the keel just leveling.

3 answers2024-07-23

Yes, the ceiling can be installed in meters high, the ordinary ceiling is 20 cm, and if you do the staggered floor, you will need 30-40.