The bathroom is always blocked, how to solve it without a basement

Updated on Bathroom 2024-07-29
3 answers
  1. Anonymous users2024-01-24

    Ask a professional to dredge it.

    Or rearrange the sewer pipes.

    Find the reason and solve it completely for reference.

  2. Anonymous users2024-01-23

    Dig and unclog pipes or replace pipes with large diameters.

  3. Anonymous users2024-01-22

    Go to the open beta, or solve it on the spot.

Related questions
10 answers2024-07-29

In the basement, it is best to raise the toilet area, set up a water barrier at the door, and thoroughly divide the dry and wet. Because the renovated bathroom does not have the conditions to collect stagnant water on the ground, you and your family will inevitably splash water when you use the bathroom, causing water on the floor. If only the sanitary ware outlet pipe is connected to the sewage lifting equipment, the ground water will seriously affect the use of the basement.

2 answers2024-07-29

If you drain the water, you should do a good job of waterproofing, and the waterproof test is also very important, and you should add a layer of waterproofing to include it. The municipal drainage system adopts the rain and sewage diversion system. Therefore, the outdoor drainage adopts the rain and sewage diversion system. >>>More

6 answers2024-07-29

Basement bathroom drainage personal recommendation to use Jinlijie brand sewage lifter, you can buy your own to try, this sewage elevator it is especially suitable for basement or garage or toilet underground domestic sewage discharge. The installation of the Golden Tie Sewage Lifter is very convenient, and the operation is simple and the footprint is small. And the material is made of stainless steel, so the service life of the product is guaranteed.

1 answers2024-07-29

There should be a special design for the ventilation part of the drawing, check the full set of drawings.

2 answers2024-07-29

There is a special basement sewage lifting pump, which can break up the manure and lift it to the sewer pipe on the first floor