What should be paid attention to when waterproofing the bathroom and kitchen?

Updated on Bathroom 2024-06-25
3 answers
  1. Anonymous users2024-01-24

    1. Bathroom waterproof construction steps.

    Step 1: You can use slightly coarser cement as a primer first, and wait for the cement to dry before brushing the waterproof coating. But in painting money, the ground should be flat and there should be no grooves. Water is then sprinkled on the ground to expel the gas from the small holes.

    Step 2: Mix the powder and liquid material evenly, and brush the bubbles if there are bubbles when brushing the paint.

    Step 3: When brushing the paint, brush it from the same direction, wait 1-2 hours, and then brush the second coat. When brushing the second layer, the direction of the brush should be opposite to that of the first layer, so that the best coverage can be achieved.

    Step 4: You can brush it several times, which can increase the density and fill the gaps. Some people think that the more layers of waterproof paint the better, or even brush six or seven layers, but in fact, this is not good, the paint is too thick and easy to crack.

    Step 5: Wait for one day before taking a waterproof test.

    Step 6: When doing the waterproof test, you should first fight with your downstairs neighbor.

    Say hello, then plug the drain, fill the ground with water, and wait an hour to ask your downstairs neighbor if there is a leak. If there is a water leak, the waterproofing layer should be rebuilt. If the waterproof test is qualified, it can be tiled.

    2. Precautions for waterproofing in the bathroom.

    1. In order to ensure that the bathroom floor is flat, it must be leveled with cement mortar, and then waterproof, so as to avoid leakage caused by uneven thickness of waterproof coating.

    2. After leveling, when carrying out the construction of the waterproof layer, it is necessary to pay attention to fire prevention and waterproofing.

    3. When doing waterproof construction, the floor drain, pipeline, and wall hole should be carefully inspected, and the root of the pipeline must be caulked according to the requirements during construction. 4. The waterproof treatment of the wall should also be noted, if the wall and the bathtub are adjacent, then the waterproof treatment height should be higher than the upper edge of the bathtub, and the shower should reach a height of 180cm.

    5. Before doing waterproofing, pay attention to the correct position of the floor drain elevation.

    6. To ensure that the sewer is smooth, the sewer pipes in the bathroom, including floor drains and toilet sewer pipes, must be kept unobstructed.

  2. Anonymous users2024-01-23

    Mainly sewers, it is best to seal a circle with quick-drying cement, the effect is very good.

    The knowledge in books is only theory, not practical.

  3. Anonymous users2024-01-22

    Henan waterproof project Xuchang waterproof Henan professional waterproof and anti-corrosion Zhengzhou waterproof and anti-corrosion project Henan thermal insulation and anti-corrosion Henan waterproof anti-corrosion and thermal insulation project Xuchang professional waterproof and thermal insulation Henan waterproof and thermal insulation plugging Xuchang professional leak plugging Zhengzhou toilet professional waterproof Xuchang waterproof thermal insulation anticorrosive coating.

Related questions
6 answers2024-06-25

1 Ground treatment.

Before waterproofing, be sure to level the ground, if the ground is uneven or the effect is not good, it may cause cracking and leakage caused by the uneven thickness of the waterproof coating. Floor drains, wall corners, pipe heels and other joints should be painted with high elasticity and flexible waterproofing, because the joints between the wall and the floor of the bathroom will be displaced, and water seepage is most likely to occur. >>>More

7 answers2024-06-25

Bathroom waterproofing is first of all the choice of waterproof type, and the general household is treated with flexible waterproof brushes. >>>More

4 answers2024-06-25

1. Leave a little space so that the ash of the shoes can leak to the bottom layer, and install lights above the sink and gas stove. When determining the location of the floor drain in the bathroom, you must first think about it and measure the size. The floor drain is best placed on the side of the brick, if it is in the middle of the brick, no matter how inclined the brick is, the floor drain will not be the lowest point. >>>More

1 answers2024-06-25

1. Do the leveling layer. First of all, the ground should be leveled with cement mortar (especially for rerenovated houses), and then waterproofing. This avoids leakage caused by uneven thickness or puncture of the waterproofing membrane. >>>More

11 answers2024-06-25

1. Bathroom waterproof construction steps.

Step 1: You can use slightly coarser cement as a primer first, and wait for the cement to dry before brushing the waterproof coating. But in painting money, the ground should be flat and there should be no grooves. Water is then sprinkled on the ground to expel the gas from the small holes. >>>More