Do you need to embed hooks to install chandeliers in the ceiling of the living room at home? It s no

Updated on Living room 2024-06-23
7 answers
  1. Anonymous users2024-01-24

    According to your situation. It's okay to install the chandelier first; But; It will cause some trouble to the construction of the ceiling. It is better for you to install the embedded frame of the chandelier first and calculate the orientation; Isn't it the best of both worlds to install chandeliers after the ceiling is finished?

  2. Anonymous users2024-01-23

    If it's not too heavy, just add two layers of woodworking board to the gypsum board, and use the extended self-tapping wire The wiring of the chandelier is on top The reserved wire should not be too long The reserved wire of the light strip only needs to be left in the light strip groove.

  3. Anonymous users2024-01-22

    There is no need to reserve hooks, the decoration ceiling will be fixed with a lot of nails on the top, and the light strip to see where you like to put it, as for the first problem, it does not need to be too long, generally the current line is hurting inside, even if it is broken, it has nothing to do with the length of the outside line.

  4. Anonymous users2024-01-21

    Half of the standard reservation is one meter two to one meter five, if it is your own suggestion, you refer to the distance from the lamp holder to the roof, after all, you can save it. . . If the hook is not a special chandelier, there is no need to reserve...

  5. Anonymous users2024-01-20

    30 to 50 cm above the ceiling, but just above the waiting place.

  6. Anonymous users2024-01-19

    You must use the hook to run two lines.

  7. Anonymous users2024-01-18

    If the chandelier is not too heavy, you can use expansion screws, there are expansion screws with hooks, and the reserved line of 30 cm is enough.

Related questions
3 answers2024-06-23

Simple instructions:

That's how you should have be: >>>More

9 answers2024-06-23

The concept of the reserved size of the ceiling is inaccurate and the procedure is wrong. The central air conditioning unit should be installed first, and then the ceiling should be used to package and hide the internal unit. AT PRESENT, THE THICKNESS OF THE MACHINE ON THE MARKET IS DAMAGED BY THE HOME INSTALLATION MACHINE, AND THE HEIGHT OF THE CEILING NEEDS TO BE 280MM, AND THE AVERAGE HOME CAN DO 300MM. >>>More

1 answers2024-06-23

All the original Aopu bath bombs have their own ventilation tubes, you can look at the accessories list of the whole machine in the bath bomb chassis.

2 answers2024-06-23

With a specially designed drilling location, you will be fine if you drill according to the drawing! Don't mess around!

2 answers2024-06-23

Install as usual, just keep the drain lower than the indoor unit. >>>More