  1. Anonymous users2024-01-24

    Hello answer, welcome your inquiry. Self-built houses do not need to be waterproof, which effectively saves some expenses. Because, the main purpose of waterproofing is to prevent water leakage on the floor and affect the residents downstairs, and it is the first floor, and there is no hidden danger that the self-built house will affect the downstairs.

    Self-built houses do not need to be waterproofed, which effectively saves some expenses. Because, the main purpose of waterproofing is to prevent water leakage on the floor and affect the residents downstairs, and it is the first floor, and there is no hidden danger that the self-built house will affect the downstairs.

    Question: If there is a bungalow, the bathroom has tiles on the floor and walls, but it is not waterproofed, will this affect the future?

    Question: Does that wall affect?

    Question: Because it shares the same wall with the restaurant, then the restaurant wall will return.

  2. Anonymous users2024-01-23

    Do waterproofing needs to be done on the surface of the water, dig excellent permeability crystalline waterproofing, you can do it yourself on the cement surface with a super permeable waterproof guard (if there are cracks and potholes on the cement surface, fill the complete with metin porcelain glue and then do waterproofing).

    For the tile surface, first check whether the filling of the tile gap is complete (if the filling of the tile gap is incomplete, fill it with Meiding porcelain glue, and then use a stone tile waterproof guard to do waterproofing).

    Exterior wall paint can be made waterproof with transparent waterproof repair adhesive.

    The product will penetrate into the base layer and make the base layer waterproof. The product is recommended to be constructed in a dry place, the drier the base surface, the deeper the product can penetrate, if the base surface is full of moisture, high density, the material can not penetrate well. Regarding the principle of waterproof plugging, the source of water leakage is not blocked, and the water will only continue to penetrate into the wall, which will exist inside the wall for a long time, and will leak out from other parts of the wall when the water reaches a certain level.

    The problem cannot be solved, and only by spraying waterproofing agent on the outside of the roof or exterior wall so that the water cannot penetrate into the wall and flow away can the problem be completely solved.

  3. Anonymous users2024-01-22

    Hello dear, the bathroom on the ground floor is also recommended to be waterproof, so that it can achieve the effect of leakage and moisture-proof.

    How else can I help you? If you can continue to consult me, if not, good luck and get rich this year above the trouble point"End of service", move your little hands to give me a thumbs up Your satisfaction is very important to me Oh call

    Question: If there is a bungalow, the bathroom has tiles on the floor and walls, but it is not waterproofed, will this affect the future?

    Question: Is there a remedy now?

    But it's okay to build your own house.

    Don't do it, unless it's just a little damp, nothing else.

    Does the question have a big impact?

    If the floor area of your sanitary napkin is small, you can remove the tile and sit down again to waterproof, if the area is large, it is not recommended that you do it.

    Question: Because it shares the same wall with the restaurant, then the restaurant wall will return.

    Then you have to remove the tiles and repaint them for waterproofing.

    Is this the only way to ask? Is there a better way to deal with it?

    Answer: Yes. Hello, I just helped you ask the nearby tile master, you can widen and deepen the gap of the ground tile to drain the stagnant water to the floor drain mouth and drain away, after widening and deepening the gap, you must do a good job of leakage prevention work to avoid leakage.

    If you don't want to shovel off the tiles, you can try this.

    Question: Now that the floor tiles have been beautifully sewn.

Related questions
11 answers2024-06-23

The first step is to remind everyone that the water circuit of the bathroom should be observed and transformed in combination with the actual situation, so as to have a detailed understanding of the concealment project. After the plan is determined, the water, electricity and heating pipes are laid and chiseled. Secondly, in the base treatment, the original decorative materials should be cleaned before the waterproofing project of the bathroom, and then the several sides are paved with cement slurry, and then the waterproof treatment is carried out. >>>More

1 answers2024-06-23

1.You can remove the tiles in the waterproof part of the door (you can extend inward to remove a few more pieces) and redo the waterproofing. Then do a 24-hour water storage test, the water storage height is the most 20 30mm, if the inspection is qualified to carry out the laying of the tiles, pay attention to the new waterproof layer must be protected in the paving process, so that we can avoid doing the second water storage test. >>>More

9 answers2024-06-23

1. Bathroom waterproof construction steps.

Step 1: You can use a slightly coarser cement to base the foundation first, and then brush the waterproof paint after the cement is dry. But in painting money, the ground should be flat and there should be no grooves. Water is then sprinkled on the ground to expel the gas from the small holes. >>>More

7 answers2024-06-23

The simpler way to do this is to remove the tiles, make a layer of waterproof paste, and then re-apply the tiles with tile adhesive.