What should be paid attention to in the construction method of bathroom tile caulking

Updated on Bathroom 2024-06-11
1 answers
  1. Anonymous users2024-01-24

    Construction method.

    1. Surface treatment: The caulking process should be carried out only after the tile is paved for 24 hours. Before using tile grout, the tile crevices should be cleaned to remove all dust, oil and other contaminants, as well as the loose tile adhesive between the tile crevices.

    2. Stirring: Use a low-speed electric drill with suitable stirring blades for mechanical stirring. According to the ratio of powder and water to 4:1, add water to tile caulk to make a paste. Let stand for 10 minutes, stir again and use.

    3. Construction: Use a rubber caulk or a suitable scraper to fill the stirred tile caulk into the tile gap, and fill the tile caulk in the diagonal direction or in a circular rotation mode. Try not to leave too much tile grout on the tile surface as much as possible, and clean the tile surface regularly with a damp sponge or cloth before the material sets.

    Remove any blemishes found as soon as possible and fix them as soon as possible.

    4. Cleaning: Use a slightly damp sponge to clean the tiles, wipe them with a clean damp cloth locally, and carry out the caulk film before drying. The tool should be rinsed with clean water immediately after use.

    After the caulk is initially dried and cured, the surface of the caulk that has been powdered is wiped off with a dry cloth, or the final cleaning is carried out with water.

    Precautions. First, cement is paved with bricks, and caulking can begin after 7 days of laying tiles. For tile adhesive paving, the caulk should be used two days later, and the temperature of the construction should not be lower than zero degrees.

    Second, the surface of the floor tiles and the connecting joints must be cleaned before caulking, first wipe the surface of the tiles with a damp cloth, wipe the wet can not leave water, this is to avoid the small holes on the surface of the floor tiles to absorb pigment and cement, and to ensure its coloring.

    Thirdly, in order to control the color and prevent the caulk from pulverizing, the surface of the tile should be wiped clean within 1 to 2 hours after caulking.

    Fourth, within 72 hours after the completion of the caulking, it is necessary to pay attention to prevent the caulk from drying, especially for the construction surface exposed to sunlight outdoors, we can use natural kraft paper to cover the construction surface to prevent other construction operations from staining the newly made joints, and special attention should be paid not to use newspapers.

Related questions
3 answers2024-06-11

For the toilet waterproofing to meet the following five standards: no leakage, no water accumulation, no overflow, no water seepage, no conduction! >>>More

7 answers2024-06-11

Tile caulk should be used in the tile room of the bathroom. >>>More

1 answers2024-06-11

For the parts that are prone to leakage such as pipe roots and water drops, evenly apply a layer of adhesive with a thickness of 1mm within 200mm of its center, then paste a layer of polyester fiber non-woven fabric, and then apply a layer of adhesive with a thickness of 1mm on the non-woven fabric. An additional layer at the wall flooding must extend into the reserved recess. 3. Lattice seam treatment, add a layer of 300mm wide coil on the lattice seam, paste it at a unilateral point, and lay a layer of 900mm wide reinforced additional layer on it. >>>More

4 answers2024-06-11

What to fill the gaps in the bathroom tiles can be waterproof, and the joint material must be selected to ensure that the bathroom does not leak.

11 answers2024-06-11

Ask a good master to do waterproofing - buy waterproof materials (barrels) - start to do waterproofing - do it again after drying - release water after drying to do a leakage test - ask the downstairs neighbor to make sure that the leak is not leaky - OK if it is not leaking