How to remedy a toilet that is not waterproofed?

Updated on Bathroom 2024-06-26
4 answers
  1. Anonymous users2024-01-24

    1 all.

    1. Take it down in the sanitary ware, reinstall it, and pay attention to the connection with the sewer pipe must use auxiliary materials such as waterstops;

    2. Remove the 3--5CM area around the floor drain to make a cement-based waterproof material.

    3. Use chemical grouting to plug leaks, punch grout on the top of your neighbor's bathroom, or grout in the tile joints of the bathroom;

    Fourth, use colored tile grout, do it on the existing gaps, and use cement-based waterproof materials or JS waterproof materials to do it in other places (nozzles).

    Fifth, the materials can be bought in the construction market.

  2. Anonymous users2024-01-23

    The new house has generally been waterproof when the project is delivered, it is made of polypropylene cloth, very good, as for the different degrees of blistering and mildew on the outer wall of the bathroom, I personally think it is normal, because most of the bathrooms are pasted with tiles and the outside or scrape putty, latex paint, wallpaper and the like, scraping putty is more obvious, it will fall off the skin and fall off, and the putty can be dealt with after several shovels off the putty scraping on the putty. You have been staying for 3 months, if there is no water seepage downstairs, it means that the water has been released, you can use it with confidence, it's okay. *Yifan sees every day* hopes to adopt.

  3. Anonymous users2024-01-22

    It is more difficult to remediate the leakage of the toilet that is not waterproof. If you hire a professional waterproof and leakage plugging unit, it can also be completely handled. Because the floor of the bathroom is generally a concrete cast-in-place structure, the process of structural reinforcement is mainly adopted, supplemented by grouting and plugging, and the long-term effective toilet seepage effect can be obtained from the bathroom floor structure.

  4. Anonymous users2024-01-21

    Truth be told, waterproofing is a super annoying thing.

    I'm engaged in decoration, and I'll tell you a word, redo it, once and for all.

    All other remedies are temporary. In the future, once something goes wrong, you will continue to toss.

    If you have your own home, don't be sloppy on the floor and wall. It's yourself who is in trouble. Wall membranes, generally reversed from the ground. At home you do 2m.

    Remember, everything is temporary, and there will be trouble later.

Related questions
3 answers2024-06-26

1. Inspect and accept the appearance, variety, specification, packaging, size and quantity of materials, and form corresponding acceptance records. >>>More

11 answers2024-06-26

Chisel the old "between the upper mouth of the floor drain and the sewer pipe and the floor slab", connect the interface between the floor drain and the sewer pipe, and then use 1:1 cement mortar and 15% of the cement content of the alum stone expansion agent to make up, you can. >>>More

1 answers2024-06-26

I can only redecorate the bathroom, shovel all the tiles that have been pasted, and then re-paste them after waterproofing. However, the rough embryo room has been done with a simple waterproof treatment before delivery, which can meet the requirements of waterproofing, you can ask the property if it is true, if not, then you have to reinstall.

1 answers2024-06-26

You can try to return it, but it will not be refunded to you, and it is estimated that it will be waterproof for you. >>>More

5 answers2024-06-26

THE HOUSE HAS BEEN BUILT WATERPROOF, USUALLY THE WATERPROOF LAYER EXTENDS FROM THE GROUND TO THE WALL, 250MM HIGHER THAN THE GROUND, BUT IN THE DECORATION, THE WATERPROOF OF THE KITCHEN AND BATHROOM CAN NOT BE AVOIDED, THE SURFACE OF THE BASE MUST BE SMOOTH, THERE MUST BE NO HOLLOWING, SANDING, CRACKING AND OTHER DEFECTS, THE MOISTURE CONTENT OF THE BASE SHOULD MEET THE CONSTRUCTION REQUIREMENTS OF WATERPROOF MATERIALS; THE WATERPROOF LAYER SHOULD EXTEND FROM THE GROUND TO THE WALL, 250MM HIGHER THAN THE GROUND, AND THE HEIGHT OF THE WATERPROOF LAYER ON THE WALL OF THE BATHROOM NEAR THE SHOWER HEAD SHALL NOT BE LESS THAN 1800MM; THE WATERPROOF LAYER OF THE COATING FILM IS EVENLY BRUSHED, THE GENERAL THICKNESS SHALL NOT BE LESS THAN 1 5MM, THE WATERPROOF SURFACE OF THE COATING FILM IS NOT BLISTERING, NOT FLOWING, SMOOTH AND CONVEX, AND THE JOINTS OF PIPE FITTINGS, SANITARY WARE FEET, FLOOR DRAINS, AND DRAINAGE OUTLETS ARE TIGHT, AND THE END IS SMOOTH AND DOES NOT LEAK After the waterproof project is completed, it is necessary to do a 24-hour water storage experiment. >>>More