After the balcony is insulated, what is the exposed layer of steel mesh

Updated on Balcony 2024-06-28
1 answers
  1. Anonymous users2024-01-24

    The insulation layer is actually a layer of engineering plastic particles, which is fixed in addition to rivets, but also with steel mesh for solid fixation, which not only plays a role in fixing thermal insulation, but also effectively connects the insulation layer and the cement mortar layer, so the phenomenon you see is normal.

Related questions
2 answers2024-06-28

This one is definitely not going to work! Because the insulation layer is only asbestos net and foam, it can not absorb the moisture of the cement at all, so it will definitely fall off after a long time, and it is recommended that the landlord modify it as soon as possible to avoid future losses! I heard that Chenyang water paint products are good, you can go to a nearby store or online to see, I hope it will help you.

1 answers2024-06-28

Yes, the normal installation on the outside of the insulation pipe should also be wrapped with a layer of cable ties.

3 answers2024-06-28

It is possible to brush directly on top of the insulation.

1 answers2024-06-28

If you want to do the wall, remove the cracks and bulging areas, and then repair it. After hitting the base, sanding flat can be painted. As for the wooden furniture against the wall. >>>More

2 answers2024-06-28

If a layer of foam color steel tile is installed on the top of the balcony, there is a certain thermal insulation effect, and it is best to install it overhead better than direct pavement.