How to install the luminaire on the chain and screw embedded in the ceiling

Updated on Suspended ceilings 2024-06-27
2 answers
  1. Anonymous users2024-01-24

    The iron chain or screw is passed through the hole reserved by the metal chassis of the lamp (if the position is not suitable, an electric drill is used to open the hole), the iron chain is twisted with a metal wire (the copper wire of the square copper-plastic wire can be), and the screw is fixed with a matching nut, in short, the lamp chassis and the embedded parts (chain, rod) can be reliably connected.

  2. Anonymous users2024-01-23

    If you want to punch a hole first, it is better to find an electrician to be safer.

Related questions
3 answers2024-06-27

It is necessary to find out where the water leaks are, and then put aside the new weld and do a pressure test.

1 answers2024-06-27

The weak current box should be connected to the telephone line! The video intercom is just connected to the unit door!

1 answers2024-06-27

Length: 400-500, width 200-350 height 200-250 Conventional reserved clean wall Toilet: The back is 300mm away from the wall, and the side is not less than 500mm >>>More

3 answers2024-06-27

1. Find the position where the grille ceiling can be stressed, hit the expansion screw, and then match the screw hole on the back of the track. It is best to find a track with a long point, which can be evenly stressed in multiple positions. >>>More

1 answers2024-06-27

Repaint.

Taobao MLS Mulinsen Lighting Fixtures Guangzhou. >>>More