How to do the toilet reserved drain

Updated on Bathroom 2024-06-10
3 answers
  1. Anonymous users2024-01-24

    First question: I don't know what you want to ask? There are very few bathrooms that still make caissons, and besides, the toilet drainage pipe generally uses only one riser.

    2.This is a common practice, the general bathroom is suspended ceiling, and the horizontal sewage pipe is left at the bottom of the floor slab is also considered to be convenient for future maintenance, and nothing can be seen after the ceiling is suspended. There are very few practices for installing on floor slabs for one reason:

    It will be buried in the ground, and it is inconvenient to repair it in the future; 2: The floor slab at the bathroom is much lower than other parts, at least 200 or more.

    3.I don't know how the drawings are required, it stands to reason that as long as the location of the toilet (or floor drain) is determined, the drainage pipe should be able to be installed, because considering the waterproof construction requirements, of course, if it is clear that you only need to leave a tee, then you can leave it as required.

  2. Anonymous users2024-01-23

    Communication: 1Now some developers have also considered the caisson floor drain, and the main bathroom is still sitting, so there is no need to lower the board, and the sewage riser of the toilet is originally a three, at most plus one ventilation;

    2.If upstairs, generally the owners will decorate the kitchen and bathroom with a ceiling, which will cover up the ugliness and facilitate maintenance (the inspection port of squatting is downstairs); On the other hand, the whole system is at its own level, which seems to be the same layer of drainage, at least 400 to consider the plate, and the specific construction process is stricter than the previous one;

    3.I haven't really thought about this, it should be realistic;

    4.Not a master, just for communication.

  3. Anonymous users2024-01-22

    Step 1: Reserve a large position at the sewer nozzle under the washbasin to avoid blocking it in the future, and then match the sewer pipe from the washbasin hole to each other. Then there is a waterproof tape to wrap around the interface repeatedly, and in the appearance, it is also necessary to pay attention to maintaining a horizontal position, and it is better to be able to apply some glue, so that the tightness of the seam can be guaranteed.

    Step 2: Twist the remaining nut tightly with the rubber ring at the bottom of the washbasin, fix it again, and then put the entire washbasin porcelain plate on the top of the sink, place the position neatly, and ensure that the rubber ring and nut appear in the center of the entire washbasin, if it is uneven, it must be adjusted evenly. Because if there are some small problems in the future, you don't know how to repair them.

    Step 3: Screw the nut to the bottom of the washbasin, that is, in the middle of the rubber ring and the porcelain plate panel, then put the other end of the sewer pipe under the floor drain, then check whether the washbasin is stable, and put a little water to observe whether there is water seeping out at the interface and whether the nut is fixed completely. Then check if there is any material missing in the whole process, finish it carefully, and make adjustments immediately if there are mistakes.

    Precautions: When choosing the washbasin sewer pipe, the length should be reserved, about 20 cm, and it is best to choose PVC pipes when selecting materials, which are durable. And the waterproof tape must be used at the interface, because if the tape is waterproof, it will crack and leak again after a while.

    This is too much to lose, time-consuming and laborious, and the last thing to pay attention to is to try to clean up the residue regularly when using.

Related questions
2 answers2024-06-10

At present, there are several ways to treat sewer pipes:

1. Red bricks, tiles on the outside, good overall effect, good sound insulation effect, not easy to have problems; >>>More

1 answers2024-06-10

Notify the plumber to repair it, and the dripping situation can only be solved by repairing and replacing the pipe.

1 answers2024-06-10

The standard is PVC110 sewage pipe!

1 answers2024-06-10

This is basically fixed: a 100mm tube can be walked around. Some sides can be changed with small tubes.

4 answers2024-06-10

The question is not very clear, the main pipeline is like a tee, the plug has a cap, this is the inspection port, used for maintenance, and your daily use has nothing to do with it. When decorating, a door should be left in this position for maintenance, at least the location of the inspection mouth should be marked, because this thing is generally not used, and the decoration part will be destroyed in special circumstances, and it is easy to destroy and repair.