The bathroom is leak proof, whether the leak proof king should use other waterproof materials

Updated on Bathroom 2024-06-22
6 answers
  1. Anonymous users2024-01-24

    1. No matter what material you are made of, as long as it is done, after the closed water (water storage) test, with 24 hours of no leakage as the standard, there is no need to do other waterproofing, otherwise, you need to redo it!

  2. Anonymous users2024-01-23

    It is enough to do a closed water test without leakage.

  3. Anonymous users2024-01-22

    The bathroom must be made of waterproof coatings, not SBS, now there are too many waterproof brands on the market, you still choose a more well-known waterproof brand. Such as the Oriental rainbow.

  4. Anonymous users2024-01-21

    I don't know what kind of material you use for leakproof, flexible or rigid, environmentally friendly or low-grade.

    Break a leg! -Sunlight waterproof, seepage buster!

  5. Anonymous users2024-01-20

    As long as it's done, it's no problem! No need to make other waterproof materials! Because you're already waterproof for the second time! The house was waterproofed once at the time of delivery! If you are not at ease, you can do another water storage test yourself!

  6. Anonymous users2024-01-19

    Yuhong waterproof, only for quality life.

    If you want to make sure that you don't have to do more trouble in the future, it is recommended that you use impermeable waterproof mortar, PMC polymer modified cement-based waterproof mortar or RX flexible waterproof mortar, these materials are specially produced according to the characteristics of the bathroom, and you should also pay attention to the operation when doing waterproofing: the surface of the base should be smooth, there should be no defects such as hollowing, sanding, cracking, etc., and the moisture content of the base should meet the construction requirements of waterproof materials; THE WATERPROOF LAYER SHOULD EXTEND FROM THE GROUND TO THE WALL, 250MM HIGHER THAN THE GROUND, AND THE HEIGHT OF THE WATERPROOF LAYER ON THE WALL OF THE BATHROOM NEAR THE SHOWER HEAD SHALL NOT BE LESS THAN 1800MM; THE WATERPROOF LAYER OF THE COATING FILM IS EVENLY BRUSHED, THE GENERAL THICKNESS SHALL NOT BE LESS THAN 1 5MM, THE WATERPROOF SURFACE OF THE COATING FILM IS NOT BLISTERING, NOT FLOWING, SMOOTH AND CONVEX, AND THE JOINTS OF PIPE FITTINGS, SANITARY WARE FEET, FLOOR DRAINS, AND DRAINAGE OUTLETS ARE TIGHT, AND THE END IS SMOOTH AND DOES NOT LEAK After the waterproof project is completed, it is necessary to do a 24-hour water storage experiment

Related questions
2 answers2024-06-22

Toilet pouring concrete should be mixed with impermeable agent.

4 answers2024-06-22

Yes, there is a practice of pouring waterproof glue into the leakage point at the leakage position, and professional waterproof companies can do it. It is a method of squeezing a waterproofing agent into the leaky floor slab with the help of the air pressure of the gas tank, but that method may not be effective, because it will fill the hole next to the hole and leak, depending on luck. >>>More

1 answers2024-06-22

This problem is easy to do, I just encountered the problem not long ago, you have to buy a special leak-proof glue, there are imported and domestic, the effect is the same, it is two kinds of glue stirred together, one is more transparent, the other is less like toothpaste is white, the two kinds are evenly stirred together to use, when you need to apply the seam clean and use a hair dryer to dry it thoroughly before you can use it, it will be completely dry in only half an hour after applying, and it will definitely not leak after this treatment. >>>More

5 answers2024-06-22

It takes a week to seep into the middle of the intersection.

2 answers2024-06-22

After changing the water and electricity, first brush it with water without leakage, and brush it again with waterproof paint.