Where is the wall plastering when there is a suspended ceiling

Updated on Suspended ceilings 2024-06-13
2 answers
  1. Anonymous users2024-01-24

    Plastering is done on the bottom of the ceiling after the plastering of the ceiling.

  2. Anonymous users2024-01-23

    。。。That's a bit of a depressing question! Looking at the calculation rules of the contract in this way, the general engineering quantity of the lamp trough can be calculated according to the linear meter or the surface. (However, it is generally in the number of meters).

Related questions
2 answers2024-06-13

No, you should brush the waterproof before plastering the wall, the ground is all done, the dry area of the wall is about 30 cm, and the area where the shower is located in the wet area can be meters.

2 answers2024-06-13

There is a ceiling plaster, but also the whole wall is plastered, because when the ceiling is fixed, there is no full plastering, the fixed position is because it is the edge of the plastering or close to the edge, it is easy to empty the shell, and the full plastering of the ceiling frame will not affect the plastering layer of the eye-punching team.

6 answers2024-06-13

The calculation should be the perimeter multiplied by the height and subtracted from the area of the doors and windows. >>>More

2 answers2024-06-13

If this "ceiling plastering" is on top of the "suspended ceiling" and the top surface of the original building, then the decision to count it is whether the construction party has carried out construction on it? If there is such a construction project, and it has indeed been constructed, then it should be counted. >>>More

2 answers2024-06-13

If the cabinet is not broken, the salary should be calculated to the person, and he will be responsible for repairing or compensating for the broken ceiling.