Lay the bricks first or hang the ceiling first

Updated on Suspended ceilings 2024-06-06
8 answers
  1. Anonymous users2024-01-24

    The decoration must be in order, if there are no steps to affect the overall effect, so its order must be clearly distinguished. Let's introduce to you whether to lay bricks or suspended ceilings first.

    1. In the living room and bedroom, the ceiling should be suspended first, and then the floor tiles should be paved. You must know that the ceiling belongs to carpentry work, relatively speaking, the garbage and dust are very large, which will not only affect the effect, but also be difficult to take care of.

    2. The ceiling of the kitchen and bathroom should be pasted with wall tiles before the ceiling, otherwise the joints will not look good.

    Eight steps to home renovation.

    1. Demolition and reconstruction of the main body.

    The main demolition can be said to belong to the earliest step, this project it includes the demolition of the wall, the wall, the shovel of the wall, the removal of heating, etc., after the demolition of the garbage is also to clean it up in time, so as to ensure the cleanliness of the room, but also to facilitate the future construction.

    2. Renovation of waterway circuits.

    Before the hydropower renovation, generally speaking, this is the first time that the cabinet designer takes measurements, and at this time, it will generally help determine the exact location of the switch, etc., and formulate the transformation plan according to these positions and sizes.

    3. Paste wallpaper.

    Sticking wallpaper will be much better than paint, after the wall paint is painted, then remember to brush nitro paint in the place where you need to paste wallpaper, the paint can generally dry the next day, and then paste the wallpaper.

    4. Install the socket panel.

    The socket panel is almost installed at this time, and at this time it is also necessary to pay attention to the function of the switch, especially like the kitchen, and it is necessary to consider the position.

    5. Install cabinets.

    At the same time as the cabinet installation, it is also necessary to buy the range hood, stove and sink in advance. It's a good idea to bring in these appliances for installation on the same day.

    6. Install hardware.

    Then before installing the floor, you should also install these small objects such as drying racks and curtain rods, so as to avoid damaging the floor during the installation process.

    7. Install the floor.

    Special attention should be paid to some details before the floor is installed, and workers should not be allowed to cut the floor in the house, and it is better to take it to the corridor to cut it is more appropriate, so that it can be cleaned as long as it is cleaned.

    > summary: about the first brick or the first ceiling related content is introduced here, the order of this installation is also determined according to the region, must not be messed up, or will not affect the later construction. If you want to know more about related knowledge, you can follow our Qeeka Home to consult.

  2. Anonymous users2024-01-23

    In general, the ceiling is suspended first, and then the floor tiles are laid. The ceiling is carpentry work, and the garbage and dust are very large, even if the bricks are paved and protected with adhesive tape, it is not ideal, and it is difficult to take care of;

    However, if it is a suspended ceiling (including gypsum board) such as a kitchen or bathroom, it must be pasted with wall tiles and then suspended, otherwise the joint will definitely not work well.

  3. Anonymous users2024-01-22

    If according to the normal order, the floor tiles are pasted first and then the ceiling. As for the problems mentioned above, there is no such thing. After the floor tiles are laid, a protective cloth is generally placed on them. Besides, you first hang the ceiling, which is also very inconvenient for the construction of workers, I hope you will adopt.

  4. Anonymous users2024-01-21

    My house is now, after the water and electricity are done. Begin to fully lay bricks, from the wall to the ground, and then in the ceiling, will the ceiling destroy the floor tiles on the ground at that time.

  5. Anonymous users2024-01-20

    Of course, the bricks are pasted first, and if the ceiling is suspended first, the bricks may be half a piece to the top position, or a small strip, which is not beautiful. The rear ceiling can be adjusted to the bricks inside.

    The first ceiling and then tiling are also easy to produce maintenance problems after the ceiling, and it is inconvenient to disassemble.

  6. Anonymous users2024-01-19

    Generally speaking, floor tiles for all decoration projects are the final process. Therefore, the ceiling is suspended first and then the bricks are laid.

  7. Anonymous users2024-01-18

    Just don't go in after the paving. The construction of integrated ceilings is not very destructive. Of course, if you want to arrange better, you can first wall tiles, then ceilings, and then floor tiles. If you have more questions, you can click on ID to consult.

  8. Anonymous users2024-01-17

    Tile first, then ceiling, and then floor tiles.

Related questions
1 answers2024-06-06

The decoration of the balcony part is generally sealed first and then tiled, which has the advantages: >>>More

1 answers2024-06-06

Do the ceiling first and then lay the tiles, otherwise the tiles will be paved and the ceiling will be damaged.

5 answers2024-06-06

Lay the ceiling first, then the floor tiles, and then whitewash. >>>More

3 answers2024-06-06

Lay the wall and floor tiles first, and the natural gas pipeline cannot be hidden, which is not only leaked and known, but also easy to repair.

7 answers2024-06-06

Of course, the floor drain is installed first, and try to choose a good quality anti-odor floor drain.