Installing 4 bathrooms in the house, how to waterproof, how to cover the sewer pipes, worrying about

Updated on Bathroom 2024-06-15
3 answers
  1. Anonymous users2024-01-24

    Looks like you're also an expert at creating water leaks.

    Be careful!!

    First deal with the cracks of the existing floor, do a good job of draining pipes, use materials such as permeable leveling glue to lay the foundation, and then brush polyurethane waterproof coatings, do not use sbs and other coils, test the water for 72 hours, do not leak can continue to fill, ceramsite is the best, fill and then do waterproofing, and then test the water, basically good.

  2. Anonymous users2024-01-23

    SBS modified asphalt membrane is used, 3mm thick and high, and the sewer pipe is slope-finding.

  3. Anonymous users2024-01-22

    Just brush it directly with "Yichen" waterproof coating, and the weight per square meter is 500g

Related questions
6 answers2024-06-15

You can put the floor plan up, don't talk nonsense! The load-bearing wall can not be changed indiscriminately, which involves the safety of the house. Designed by DoLong, a Chinese style decoration expert, a service organization with ideals!

10 answers2024-06-15

If you're worried about water leakage, the most direct way is to test the water. If there is a water mark on the root of the pipe, it must be that he didn't wrap the pipe for you, or he didn't make it tight. If you want to paint yourself, you can buy some polyurethane, but you don't use much of that, and most of it is sold in barrels. >>>More

3 answers2024-06-15

Think about it, your budget, your area, your house, old and new, ......The new house, which has not been done before, will be ordered, the flexibility and strength are large, the importance of odorless and environmentally friendly waterproofing will not be repeated with you, the material will be selected to be good, Dongfang Yuhong is good, there is such a sentence in this industry, three points of materials and seven points of work, that is, no matter how good the material is, if it is not good, it will not be used. Therefore, when the material is selected well, it is also necessary to find a good master.

1 answers2024-06-15

The first step, before the waterproof treatment of the bathroom, the first thing is to level the floor level of the bathroom, the ground is uneven, when the waterproof paint is painted, it may be uneven, or the ground is easy to crack because of unevenness, which will crack with the ground even if the waterproof paint is applied. >>>More

1 answers2024-06-15

Someone who understands design should check out the scene of your home. Then give design advice. At the very least, you need to know where the water comes from and where it goes down.