After the bathroom layer box is waterproofed, it is sealed and the floor tiles are pasted on it

Updated on Bathroom 2024-06-10
3 answers
  1. Anonymous users2024-01-24

    Waterproofing still has to be done, the life does not affect, otherwise the downstairs leaks, and then you have to open the floor tiles to redo the waterproof,

  2. Anonymous users2024-01-23

    The waterproof layer of the original house was made when it was built.

    There should be no problem.

    But after the decoration, such as the installation of water pipes, chiseling the ground will destroy the original waterproof layer, so it is necessary to redo the waterproof layer, it is recommended that the wall should also be done to avoid troublesome for reference in the future.

  3. Anonymous users2024-01-22

    Generally, it is necessary to do it again, and it is best to use cement-based waterproofing materials.

Related questions
1 answers2024-06-10

The bathroom is waterproof, the standard practice is that the ground needs to be done all, and the wall should be at least meters, and it is recommended to do it full height. If it is a lightweight wall, then the wall must be made to full height. >>>More

5 answers2024-06-10

Tips for bathroom decoration to prevent leakageMany families have to knock off the original bathroom wall and floor tiles and lay new tiles in the decoration. As a result, it is necessary to re-do the waterproofing work on the wall and floor of the bathroom. If there is a quality problem in the waterproofing project, the water stain will leak to the next room, or it will leak downstairs, causing serious damage to your home and neighborhood. >>>More

2 answers2024-06-10

The reason for waterproofing is not done well, especially around the sewer pipe, the upper water pipe, and the floor drain. >>>More

5 answers2024-06-10

It is a phenomenon that often occurs when I have done waterproof and leakage, and I have not tried the water at that time. Have you touched the toilet floor afterwards? How did you negotiate with the waterproofing workers who did it when you found someone to do it? >>>More

1 answers2024-06-10

This problem is estimated to be a problem of quality and craftsmanship, bathroom water seepage, to remove all the floor tiles, and then use a hard brand of waterproof agent to make the ground, and on the wall to make at least a meter high waterproof material, in order to prevent water seepage. In addition, it is necessary for professionals to construct and ensure quality. >>>More