What should I do if the reserved pipe of the main sewer is broken when the bathroom is renovated for

Updated on Bathroom 2024-06-16
2 answers
  1. Anonymous users2024-01-24

    After closing the sluice gate, it is easier to use quick connectors, PVC or PPR for metal pipes.

  2. Anonymous users2024-01-23

    Be sure to deal with it.

    Find the property and explain the situation.

    Repairs are arranged by the property.

    The owner pays for the repairs.

Related questions
4 answers2024-06-16

The "cement mortar" you are talking about should be to use the dry paste method to pave the floor tiles, so that the ground will be a few centimeters higher. If you want to make it a little lower, you can use the wet paste method to lay the floor tiles. It is directly mixed with cement and water to form a cement slurry, and then scraped on the back of the floor tile to bond with the ground.

1 answers2024-06-16

The second decoration needs more ground leveling, because the tiles paved by the first decoration are to be removed with a percussion drill in the second decoration; >>>More

1 answers2024-06-16

From the perspective of feng shui, it is best not to change the bathroom into a cloakroom, which will have an impact on the feng shui of the whole home; But in other ways, it can be changed, but in the process of changing it will be more troublesome and costly, after all, the bathroom is more humid, and after changing it to a cloakroom, it will make the clothes more humid and easy to mold.

3 answers2024-06-16

If the upper part of the bathroom hole is really a ring beam, then it must be restored, and it cannot be continued to be chiseled. Unauthorized change of load-bearing structure, a fine of 50w. What I'm talking about is that in general, the upper part is a lintel and not a ring beam. >>>More

1 answers2024-06-16

The floor of the bathroom is raised, and the drain pipe must be lengthened.