Only the kitchen and bathroom should be waterproofed

Updated on Kitchen 2024-06-28
1 answers
  1. Anonymous users2024-01-24

    If you move the wall of the bathroom, such as opening the door hole or moving the position, you need to re-do the waterproofing, including the ground and wall, you can ask your construction party, it is still very simple to do, just asphalt with water.

    The ground is covered with a waterproof layer, and the wall near the bathtub and shower room can be waterproof at a height of 1.8 meters.

    The kitchen can be left out because there is no need for that.

Related questions
7 answers2024-06-28

1. The kitchen is generally not waterproofed, because the kitchen only has a water bucket, and it will not use a lot of water to wash the ground, so there is generally no need to do waterproofing. >>>More

2 answers2024-06-28

1. First of all, the kitchen and bathroom need to be waterproof, the bathroom needs to be waterproof, the ground needs to be all done, the wall should be at least meters, and it is recommended to do it with a full height. The kitchen waterproof floor is all done, the wall is back to the height of the meter, and the waterproof height behind the vegetable sink is above the water outlet.

2 answers2024-06-28

The reason why we all know that the bathroom needs to be waterproof is because the bathroom is a necessary place for home life, and it has a shower room, so this area will inevitably lead to a large area of water flowing to the ground and then losing from the floor drain during the later use process, so the waterproof thing is produced to ensure that the water will not leak to the lower floor; >>>More

2 answers2024-06-28

It must be waterproof to prevent water leakage to the residents below, and compensation is required if the damage is caused.

4 answers2024-06-28

<> bathroom wall also needs to be waterproof, and the height should be more than 30cm, and the waterproof height of the shower area should be more than 180cm. Whether it is ground waterproofing or wall waterproofing, it must be done well when decorating, otherwise it is very troublesome to have problems with waterproofing in the later stage, and it is also necessary to knock off the decorated tiles and redo waterproofing. After doing the waterproofing, you need to do a closed water test, that is, plug the floor drain, and then put water on the bathroom floor for 24 hours, if there is no water leakage within 24 hours, it means that the waterproof is qualified, and then pave the tiles after the closed water test is passed.