How to install the secondary beam of the integrated ceiling

Updated on Suspended ceilings 2024-06-28
2 answers
  1. Anonymous users2024-01-24

    First confirm the size of the secondary beam frame (this can provide the size of the decoration hall to the secondary beam manufacturer, they will calculate it for you), and then wait for the secondary beam to come back, first draw the ink line on the top, hit the top explosion at the corresponding position, pull the pull rod, and then assemble the secondary top underground, several people lift the secondary beam to the top on the edge of the secondary top frame, fix the screws, and finally put the main bone, keel, and board loading. Done--

    As for the secondary beam order, I recommend Foshan Shalong ceiling accessories, an old company of more than ten years, with perfect service and high-quality products.

  2. Anonymous users2024-01-23

    First of all, fix the height of the edge strip, pay attention to the horizontal installation.

    Assemble the secondary ceiling profile, pay attention to the fixing parts first.

    The secondary ceiling frame is positioned and the screw rod is installed.

    Install the secondary ceiling frame, adjust the screw control height, and it should be horizontal with the edge bar.

    If the size of the secondary profile frame is large, the main bone and screw rod should be installed to hang and reinforce.

    The triangular keel should be 5 cm long, measure the distance at both ends, cut a hole in each (do not cut off), and snap into the edge of the profile.

    If necessary, you can also increase the in-void distance, only need to improve the installation skeleton, but for the installation of the side gusset, the triangular keel should be added about 30 cm.

    The side gusset is machined to size and inserted between the top two gusset plates or the triangular keel.

    Install the skeleton around the secondary profile frame.

    Finally, the installation of electrical appliances and gusset is completed.

Related questions
4 answers2024-06-28

I can't understand the drawings of the aluminum beams in the secondary ceiling of the living room, so I want to ask how to see it.

2 answers2024-06-28

The craftsmanship of the installation master is required, and the general interface is used to close the edge, and the glass glue can be used.

1 answers2024-06-28

The floor height of the dwelling is very important. If the floor height is very low, or even lower than the meter, then it is not suitable to integrate the ceiling in a large area, but the ceiling can be integrated in a small area in the local area, such as hanging a circle around the house more than ten centimeters wide, 10 18 centimeters high secondary roof, embedded upward illumination of the light, and the middle part to maintain the original height, can be used to paint the top, so that the top surface appears to be as high as the sky, but also enrich the top layer. The same effect can be achieved by partially integrating a suspended ceiling in a hidden part of the room. >>>More

1 answers2024-06-28

Integrated Ceiling The secondary ceiling installation process is as follows: >>>More

2 answers2024-06-28

If the gap is small, you can put something between the aluminum beam and the wall to solve it, and there is no way to solve the large gap. The aluminum beam should be formed at one time, and the technical requirements are high.