Urgently, the decoration destroyed the bathroom floor, and the floor heating was directly paved, I w

Updated on Bathroom 2024-06-20
3 answers
  1. Anonymous users2024-01-24

    1. Do waterproofing before all floor tiles Remember to apply a few more layers to the sewer pipe!!

  2. Anonymous users2024-01-23

    If the floor heating pipe is damaged, you need to re-dispose of the pipe and then lay it, otherwise the downstairs neighbor will suffer.

  3. Anonymous users2024-01-22

    Theoretically, no problem, but with quality.

Related questions
5 answers2024-06-20

It depends on how you did the original waterproofing to decide if you need to do it all over! Provide free professional technical consultation for concrete waterproof leakage repair.

3 answers2024-06-20

Bathroom waterproof construction technology, process and precautions Before the bathroom decoration construction, we must first determine the design of the water circuit, and we must consider the possibility, feasibility and availability of the design scheme in detail. Lay the water, electricity and heating pipes first, and then level. When doing waterproof construction in the bathroom, the base layer should be treated first. >>>More

2 answers2024-06-20

It's best not to, if you don't clean it for a long time, there will be a lot of stains underneath.

8 answers2024-06-20

PVC flooring can be laid on any surface, but it can only be laid after self-leveling and leveling. And pay attention to whether the gap of the raised rear door is enough to lay the need. If it is not enough, raise the door appropriately. If it's a sliding door, it's not needed. >>>More

4 answers2024-06-20

The tile surface of the bathroom floor has been damaged somewhat, and it will not seep water just because the tile surface is damaged for a long time. >>>More