The bathroom floor was waterproofed and coated in two layers to make it 4 5 cm high, and the water w

Updated on Bathroom 2024-06-15
8 answers
  1. Anonymous users2024-01-24

    Some of them should be criticized for being irresponsible!

    Bathroom waterproofing, wall waterproof construction with shower facilities, wall waterproof construction height should not be less than meters, kitchen wall should be lower than meters, bathroom waterproof coating more. There are no examples one by one, and you have not explained what type of waterproof paint you have in your home, I will give an example here:

    Home decoration waterproof coating commonly used "polymer cement waterproof coating" (referred to as JS waterproof coating) Remarks: JS waterproof coating is also divided into type and type waterproof coating, JS waterproof coating on the market is mostly two-component waterproof coating, that is, waterproof coating barrel, liquid and powder bags are packed, only a bag of liquid material and a bag of powder can be mixed evenly when used.

    When used during construction:

    Generally, 3 times of painting, until the design requirements are met, the minimum requirements should not be less than millimeters, and the bathroom wall is meters high. Each brush is applied in a perpendicular direction to each other.

    Closed water test: After 48 hours of dry solidification, do 24 to 72 hours of closed water test closed water height of 20 cm, and only after passing the inspection can the process be carried out.

    The problem with your home is; 1. The construction height of the waterproof coating is not enough, resulting in the hidden danger of water leakage on the wall.

    2. The time of the closed water test is not enough, and the water may not be able to penetrate the base surface, so the water leakage point cannot be found.

    3. Although there is no problem now, there will be a problem after a long time.

    Suggestions: 1. Find a decoration company as soon as possible to rectify the waterproofing.

    2. Require the establishment of a maintenance contract treaty.

    3. It is enforced by no legal means.

  2. Anonymous users2024-01-23

    There should be no problem for the ground, but for the bedroom wall, it is necessary to do a 130 cm high waterproof, otherwise even if the wall tiles are pasted, the moisture will still be printed into the wall, causing the bedroom wall to resurge.

  3. Anonymous users2024-01-22

    There will be no problem, but be careful that the slope of the ground must be appropriate.

  4. Anonymous users2024-01-21

    It shouldn't be a problem, but pay attention to the slope of the storefront.

  5. Anonymous users2024-01-20

    The waterproofing of the ground can be, the wall is a little low, especially in the shower area, the waterproof ground water is easy to penetrate into the wall, causing the adjacent wall to be damp. The bathroom shower wall is made 180 cm, and the other walls are made 30 cm high.

    Leibangshi - home waterproofing expert.

  6. Anonymous users2024-01-19

    The floor can be done twice, and the height of the wall should be at least 30 cm high.

  7. Anonymous users2024-01-18

    The national standard stipulates that the place where the water is used needs to be waterproof, requiring the ground to be brushed three times, the wall to be brushed twice, the shower to be brushed to a meter high, and the thickness of the waterproof membrane is millimeters. Do it.

  8. Anonymous users2024-01-17

    The floor is OK, but the wall with a shower must be at least 1.8 meters high.

Related questions
6 answers2024-06-15

The reason why you do this waterproof and reverse the water is this, the reason is that the ground is not completely dry, because the moisture inside is reversed after brushing the waterproof, this has no effect on the quality, you can wait for the first waterproof to be completely dry in the second brush, I hope it will help you.

2 answers2024-06-15

However, the waterproof layer is coated with multiple layers, and if the construction is not paid attention to or there is no certain construction technology, it is easy to dry and crack, resulting in leakage. The waterproof layer must be carefully and meticulously, there can be no missing brush, the thickness of each brush can not exceed 1mm, and it must wait for the first brush to dry slightly (generally 1-2 hours) before the second brush, each time it must be so meticulous in place. After the waterproof layer is done, the inspection method is mainly through the closed water test, at least 24 hours in summer and 48 hours in winter, and the water test height is increased as much as possible. >>>More

3 answers2024-06-15

Yes, this makes it more waterproof. The tarpaulin should be used with polypropylene and cement glue, otherwise the paste is not tight and it is easy to rise.

2 answers2024-06-15

Which side of the leakage is repaired, this is generally the leakage of the gap around the floor drain, it should be done at that time when it was not blocked, to knock off the floor drain around and re-seal and fix it with waterproof materials, and brush the waterproof paint again as a whole is only on the surface, useless.

2 answers2024-06-15

Generally, the staggered lashing means that the upper and lower layers of steel bars are not in the same position in the direction of the horizontal beams, and they are staggered to the center, that is, if the spacing is 200mm, the projection spacing of the steel bars is 100mm after staggering, and the spacing is reduced invisibly. If the top and bottom are facing each other, then the upper reinforcement cushion block is not easy to place. We're all slightly staggered here, but not exactly. >>>More