What materials are needed for the fire protection drawing review of the restaurant of more than 300

Updated on Restaurant 2024-06-20
1 answers
  1. Anonymous users2024-01-24

    (2) Building interior and exterior decoration, building insulation, change of use, and renovation of fire protection facilities.

    1. "Application Form for Fire Protection Design Review of Construction Projects" (stamped with the official seal of the construction unit);

    2. The "Opinion on Fire Protection Acceptance of Construction Engineering" or the certificate of fire protection record for completion acceptance of the building (the copy is stamped with the official seal of the construction unit);

    3. A copy of the interior decoration design drawing (including the description of decoration materials), power, lighting and other electrical circuit layouts, and if there is a fire protection project, the fire protection design drawings should also be submitted (including automatic sprinkler system, automatic fire alarm system, smoke prevention and exhaust system, etc., and the drawings should be stamped with a special seal for design drawings);

    4. Proof of use of the site or lease contract or sublease contract (copy stamped with the official seal of the construction unit);

    5. Legal identity documents such as the industrial and commercial business license, industrial and commercial pre-approval notice or organization code certificate of the construction unit (the copy is stamped with the official seal of the construction unit);

    6. Legal identity certificates and qualification documents such as industrial and commercial business license or organization code certificate of the design unit (copy stamped with the seal of the design unit);

    7. If the legal representative comes to handle it, he or she shall provide a copy of his ID card, and if the non-legal representative comes to handle it, he shall issue a power of attorney to entrust the personnel of the unit, and at the same time provide the identity documents of the client and the entrusted person;

    8. Bring your own file box.

Related questions
1 answers2024-06-20

This would have been set up if the building had already existed. What was originally there did not need to be added.

1 answers2024-06-20

This is greater than or equal to 300 square meters only need to be recorded, and those that do not exceed are directly handled for opening inspection.

2 answers2024-06-20

It is related to the building, hazard level, sprinkler specifications, plane layout, etc.

4 answers2024-06-20

If it is necessary, because it is a public gathering place, according to Article 15, before a public gathering place is put into use or opened, the construction unit or user unit shall apply to the fire department of the public security organ of the local people's government at or above the county level where the venue is located for fire safety inspection. >>>More

2 answers2024-06-20

It depends on your decoration needs, and the decoration style, as well as the price of the main material to position.