During the renovation of the new house, the bathroom leaked and soaked the wooden floor, and the dec

Updated on Bathroom 2024-06-13
7 answers
  1. Anonymous users2024-01-24

    There is a principle for --- decoration project, cross construction.

    Whoever ends up will be held responsible! If the previous construction is not in place, you can put it forward, or refuse to re-build, answer or ask for rectification, or notify the owner to inform the defects, and declare and visa.

    --- looking for the one that was installed, why do you do porcelain work without diamonds? There's really no way to deal with it, there is! And a lot, this is a completely irresponsible performance.

    Let's talk about an example, you listen: now, many home decorations are first laid with floor tiles, and then decorated; Many of them are paved with floor tiles and decoration is not one; The problem is --- there are often broken floor tiles, so they start to rip off; You'll never be able to figure out responsibility. Therefore, I stipulate that when the construction team enters the construction site, all those who have contact with us will be inspected first, and there will be no objection to start construction; Later, I found out that --- deserved it! You pay!

  2. Anonymous users2024-01-23

    The tiles are thickened with water pipes.

    Buried deeply, leading to du's water

    The mouth can't be connected to the water pipe properly, dao he can.

    Refuse to install, and then inform you that you can contact the decoration company, he did not fulfill the obligation to inform, resulting in his own unqualified installation caused by floor invasion. So this matter should be the bathroom to bear most of the responsibility. The renovation company did not do a good job of supervising the project, you can look at what your renovation contract says, he is responsible for a small part of the responsibility.

    You can ask the person who installed the flooring if there is anything that can be remedied.

  3. Anonymous users2024-01-22

    By the installation of the bathroom, the depth of the water pipe buried can be used with a joint, or refuse to install, do you have no floor drain in the bathroom?

  4. Anonymous users2024-01-21

    Strictly speaking, whoever breaks it is responsible, according to your case, the bathroom installer is the most.

    DAO bears at least 80% of the decoration.

    About 20% back to the company, if the answer is that the reserved faucet is too deep, you can use the inner and outer wire lengthening to directly solve this problem, I think the installer will not even know these common sense, if he wants to say that he does not know, can be 100% responsible. You can talk to them privately first, if you can't expose it first and then sue, it's up to you, of course, you may have to bear a little bit of the latter. But it's good to be able to solve it, right?

    Harmony is precious.

  5. Anonymous users2024-01-20

    According to you, this is a problem with the installation of the bathroom. However, the decoration project has not been completed, and it has not been officially delivered to you! They are also responsible for this, and the protection of the finished product is not done well.

    One is the party directly responsible, and the other is the management responsibility. Anyway, the matter is not done yet, and the money is dragging them down! I don't know if there is a need for a lawsuit.

  6. Anonymous users2024-01-19

    I sell bathroom cabinets, if the bathroom product package is installed, this responsibility should be borne by the person who sells bathroom products, and you can also complain about 96315

  7. Anonymous users2024-01-18

    In fact, there are many such problems, most of which are caused by the poor quality of hardware accessories, and many times the tiles have to be removed and reworked. Edition.

    The bathroom market is chaotic.

    The right is very, the winter angle felling freeze cracked, the drainage pipe is broken countless, which steel wire folding pipe is actually more can not be used for drainage, but now it sells the best, when the consumer feels that he is unlucky, in fact, the process to achieve folding material must be hard and thin, otherwise it can not be broken, consumers feel that there is a steel wire on the strong. Stainless steel drainage is really stainless less than 10%. Good products can't come in because they sell bathrooms and send hoses, of course, send 1 piece, if you want a good one, I recommend copper.

    It is recommended that you do not enjoy the free one, and lower the price of Suzhou Donglin to sell a practical one, which is definitely not worse than the original TOTO factory. The white one (Bangflex's) is small without folding, and there is a kind of submarine, it is recommended to buy Bangflex, I personally think that the anti-siphon anti-siphon anti-odor reliability of diving will weaken after there is dirt residue, and the lower part is folded, and the wall is relatively thin.

Related questions
1 answers2024-06-13

Although it is not recommended to use rigid waterproofing, but to do, there should not be a big problem, now generally do not use rigid directly, are used flexible, easy to til, and have a certain tensile force, compared with rigidity is more suitable for long-term waterproofing.

1 answers2024-06-13

1.The main bathroom pipe is arranged by the developer when the house is built, and it is also shared by the owner, and the developer sells the house; Then it was transferred to the property, so if there was a problem with the main pipe of the bathroom, if the reason was not considered, the pipe should be repaired by the property; >>>More

4 answers2024-06-13

1.Pls I don't have a contract to sue.

There is no contract to sue, because the contract does not have to be written or oral, but you must have evidence to prove the existence of a contractual relationship between you, such as a bill of materials, proof of transfer of payment, etc. The basis is Article 10 of the Contract Law. >>>More

3 answers2024-06-13

If you want to handle the decoration, you need to go to the property for the record in advance, and the property will inspect the decoration site to reduce potential safety hazards. Generally, no deposit is paid, but there will be decoration management fees or construction slag removal freight. The waiting time is generally the approval time of the property engineering leader, which generally depends on the recent decoration amount of your community, ranging from 3 to 7 days. >>>More

2 answers2024-06-13

If it is a housing quality problem identified by a qualified institution, the employer (owner) shall be responsible for repairing it; If it is a water leak caused by the contractor's renovation, the contractor is responsible for repairing it.