How quickly to install the floor tile in the bathroom

Updated on Bathroom 2024-06-05
1 answers
  1. Anonymous users2024-01-24

    Cement, the tile should be soaked in water, the four corners of the back should be smeared with cement, and there should be a little in the middle, and the ground should be smeared with cement.

Related questions
2 answers2024-06-05

The watering can sprays a mist of water and scrapes it clean with a tool that has a strip to scrape the glass.

1 answers2024-06-05

Use a blade to get it down, if the back is not firmly glued, then remove the original cement and then stick it with tile glue or cement.

1 answers2024-06-05

Just plug it with structural adhesive! It can't be said to be bonding! >>>More

1 answers2024-06-05

If the thickness is less than 5 cm, mortar ash can be used, and more than 5 cm can be used bean stone concrete.

3 answers2024-06-05

Ceramic tiles must be pasted by a professional bricklayer master. Do not touch it within 24 hours after pasting, otherwise it will be "empty"!