How high the inspection opening on the toilet drain should be from the ground

Updated on Bathroom 2024-06-18
4 answers
  1. Anonymous users2024-01-24

    1 meter, the upper and lower error does not exceed 20 mm.

    The national water supply and drainage engineering acceptance code stipulates that "an inspection port should be set up every other layer on the drainage riser, but an inspection port must be set up on the lowest floor and the highest floor with sanitary appliances, the center height is 1 m from the operating ground, the allowable deviation is 20 mm, the orientation of the inspection port should be easy to maintain, and the inspection door should be installed on the inspection port on the concealed riser".

  2. Anonymous users2024-01-23

    Generally speaking, the toilet drain should be inspected more than 1 meter from the ground.

  3. Anonymous users2024-01-22

    ÅÅË1 m ,Ô20 mm ,¼

  4. Anonymous users2024-01-21

    Summary. Hello (How high should the inspection opening on the bathroom drain be from the ground?) 1 meter, the upper and lower error does not exceed 20 mm.

    The national water supply and drainage engineering acceptance code stipulates that "an inspection port should be set up every other layer on the drainage riser, but an inspection port must be set up on the lowest floor and the highest floor with sanitary appliances, the center height is 1 m from the operating ground, the allowable deviation is 20 mm, the orientation of the inspection port should be easy to maintain, and the inspection door should be installed on the inspection port on the concealed riser".

    Extended Materials. Toilet drainage.

    And by lowering the toilet floor or raising the toilet floor surface layer, an intermediate layer is produced between the two, and the toilet interface, the bathtub interface air trap box, the sink interface air trap box, the floor drain air trap box, the dredging box and the transverse connecting pipe are buried in the middle layer. The current drainage pipe of the upper toilet passes through the floor slab, and the form of connection and assembly is completed in the upper space of the lower floor, which solves the various contradictions caused by the repair of the drainage pipe blockage, water leakage, and floor seepage.

    How high the inspection opening on the toilet drain should be from the ground

    Hello (How high should the inspection opening on the bathroom drain be from the ground?) 1 meter, the upper and lower error does not exceed 20 mm. The national water supply and drainage engineering acceptance code stipulates that "an inspection port should be set up every other layer on the drainage riser, but an inspection port must be set up at the lowest level and the highest layer with sanitary appliances, and its center height is 1 m from the operating ground, and the allowable deviation is 20 mm, the orientation of the inspection port should be easy to maintain, and the inspection door should be installed on the concealed riser".

    Extended data toilet drainage by lowering the toilet floor or raising the toilet floor surface layer to create an intermediate layer between the two, the toilet interface, the bathtub interface air trap box, the sink interface air trap box, the floor drain air trap box, the dredging box and the transverse connecting pipe are buried in the middle layer. The current drainage pipe of the upper toilet passes through the floor slab, and the form of connection and assembly is completed in the upper space of the lower floor, which solves the various contradictions caused by the repair of the drainage pipe blockage, water leakage, and floor seepage.

    I hope I can help you, if you are satisfied with my service, please give a thumbs up, and I wish you all the best.

Related questions
2 answers2024-06-18

The first to fifth floors of the toilet drain pipe are equipped with expansion joints, but the sixth floor (top floor) has become an exhaust pipe, whether to install expansion joints?

1 answers2024-06-18

Buy a tube with flaring and straight-through, a bottle of glue, and ask a water master to help pick it up, the process is a little troublesome, and it takes experience and technical cooperation to replace it.

9 answers2024-06-18

The toilet sewage inspection port can be sealed after the renovation is completed, and it must be sealed after the decoration is completed, for insurance. The toilet sewage inspection port is equipped with an openable inspection cover and is installed on the drainage riser and the long transverse pipe section for inspection and clearance. The inspection port is generally installed in the riser, for the connection between the riser and the transverse branch pipe when there is a foreign body blockage, and the drainage riser of multi-storey or high-rise buildings should be installed every other layer, and the spacing between the inspection ports is not more than 10m. >>>More

9 answers2024-06-18

The toilet sewage inspection port can be sealed after the renovation is completed, and it must be sealed after the decoration is completed, for insurance. The toilet sewage inspection port is equipped with an openable inspection cover and is installed on the drainage riser and the long transverse pipe section for inspection and clearance. The inspection port is generally installed in the riser, for the connection between the riser and the transverse branch pipe when there is a foreign body blockage, and the drainage riser of multi-storey or high-rise buildings should be installed every other layer, and the spacing between the inspection ports is not more than 10m. >>>More

1 answers2024-06-18

Hygiene: What is the distance of the toilet drain trap?