More than 10 years ago, when the house was renovated, the bathroom was squatting, and there was no o

Updated on Bathroom 2024-06-04
8 answers
  1. Anonymous users2024-01-24

    For the old house more than 10 years ago, when the bathroom was renovated, it was more troublesome to reinstall the toilet. Because the waterproofing problem of this old house is very poor, so for the second renovation of the old house, the ground must be completely planed off.

    It is also possible to move the exposed pipes on the roof of the shed by 30 cm, and many plumbers now have such technology, the reason for this is that the space of the bathroom can be improved for later use, and there will be no sense of oppression.

    The reason why the ground is also planed is to do waterproofing, if the waterproofing is not done well, any impact on the downstairs in the later use will be borne by you, so since you are ready to transform, you must deal with it in an all-round way. Of course, waterproofing is very important, not only on the ground, but also at a distance of 40 cm to 60 cm on the wallAfter waterproofing, of course, you can install the toilet directly at the sewer outlet of the original squatting.

    But the location of the sewer mouth can not be changed, if one is carried out, there will often be congestion problems in the later stage, in fact, we have many places in the decoration process can not be changed, the first point is the main pipe mouth of the sewer, the second point is the main pipeline of natural gas, of course, many people change the location of the stove will extend the natural gas pipeline, but not change the main pipeline.

    Even these small changes need to call the gas company, and there are special alteration personnel who pay to come to the door to make changes. The most important thing is that load-bearing walls are untouchable. I think the property company will also communicate with the owner before renovating.

  2. Anonymous users2024-01-23

    Directly dismantle the pit, start from laying bricks and rebuild, and do a good job of waterproofing.

  3. Anonymous users2024-01-22

    If you want to install a toilet, the toilet must be higher than the ground, so you must renovate it, sink it first, make a good pipe, then do a good job of waterproofing, and then install the toilet.

  4. Anonymous users2024-01-21

    You can disassemble the squatting toilet and install a toilet, find an installation company to see how to design the drain is reasonable, and the toilet should be made in the position of the squatting position, and use a sewer.

  5. Anonymous users2024-01-20

    It is possible to install the toilet, remove the original squatting toilet and choose a suitable caliber toilet to install.

  6. Anonymous users2024-01-19

    It is necessary to plane the entire ground, which is still more troublesome, and it is necessary to pay attention to waterproofing.

  7. Anonymous users2024-01-18

    You can dismantle it directly, and then go to the decoration master to install it.

  8. Anonymous users2024-01-17

    This should be easy to get, find a professional to get it for you, it is generally difficult to get waterproof well.

Related questions
1 answers2024-06-04

If it's a leak caused by your home's waterproofing problem, it's your burden. If it's because of their renovation, the pipe leakage is the one they are responsible for.

2 answers2024-06-04

It is recommended that you change it back, what if there is a toilet above your bedroom.

1 answers2024-06-04

Bathroom due to the frequent use of water (toilet, bathtub, shower room or washing machine, etc.) the ground or wall often has water, if not waterproof, even if the tiles are paved, there will be water through the tile gaps, once the ground is soaked in water, it is easy to cause water to penetrate downstairs through the floor slab, or through the partition wall to the next door, causing the loss of other people's homes will be very troublesome, and even cause economic losses. Therefore, when decorating, the bathroom must be waterproof. >>>More

21 answers2024-06-04

Of course it is possible to interfere. Because your bathroom is moved 20 cm outward, then it will affect the sunlight and lighting problems of the owners downstairs. If the matter goes directly to the court, then you have no chance of winning the case.

3 answers2024-06-04

It's hard to say, if you have definitive evidence that you haven't moved the ground, then it's the responsibility of the property and the developer.