Do you do waterproof in the bathroom before doing underfloor heating?

Updated on Bathroom 2024-06-05
2 answers
  1. Anonymous users2024-01-24

    Do you do waterproof in the bathroom before doing underfloor heating?Floor heating is waterproofed once before, waterproofed once after backfilling, a must. Otherwise, it will be very troublesome to have problems in the later stage

    The state stipulates that the toilet must be waterproof, because the bathroom often needs water, that is, there is often water underground, if it is not waterproofed, the water will leak downstairs, so the state mandates that developers must do waterproof when building houses. The international standard stipulated by the State Construction Committee is meters, and the house has been waterproofed when it is built, and the waterproof layer extends from the ground to the wall, which is 220mm higher than the wall, but the waterproofing of the wall is basically not. According to the conventional bathroom, the height of the waterproof layer on the wall of the shower head shall not be less than 180mm, and the general thickness shall not be less, and the water storage test must be done for 24 hours after the waterproofing is completed.

  2. Anonymous users2024-01-23

    Usually waterproofing is carried out before doing underfloor heating, and it is generally enough to paint twice. However, in the construction of the waterproof layer that has been done, we must pay attention to protecting this waterproof layer. I hope you find this answer helpful.

Related questions
15 answers2024-06-05

Do you do waterproofing or underfloor heating in the bathroom first? >>>More

11 answers2024-06-05

Bathrooms should not be underfloor heating.

The bathroom is damp, and if the floor tiles are not conducive to drainage, it is easy to store water under the bricks. After installing underfloor heating, it is easy to smell back. >>>More

5 answers2024-06-05

The waterproofing project of the bathroom is an extremely important step in the decoration, and if you are not careful, you may pick up the tiles and rework them because of leakage problems. If underfloor heating is used, the waterproofing of the bathroom must be made in two layers. The first layer is done before the floor heating is laid. >>>More

1 answers2024-06-05

Generally, the wet area of the bathroom is waterproof twice, before installing floor heating, and then after installing floor heating, it is safer

1 answers2024-06-05

First, the installation of floor heating is sure to do waterproofing, the purpose is to prevent water pipe leakage will not affect the downstairs, if there is a condition to do two times waterproofing, floor heating above the layer below, if there is no condition, then do the upper layer, that is to say, after the floor heating is laid, install waterproof to do a closed water test. >>>More