    1. The bathroom wall is waterproof.

    Bathroom waterproofing is one of the most important issues, and we must pay attention to it when designing home decoration. If the white walls are disfigured by the seeping water, it is not only an economic loss, but also affects the quality of life. So how is the bathroom waterproof?

    Before doing waterproofing, be sure to clean the ground and paint it 2 to 3 times with polyamide waterproof paint.

    When the bathroom is bathed, it will splash water on the adjacent wall, and if there is no waterproof layer to protect it, the adjacent wall and the opposite corner wall are prone to dampness and mildew. Therefore, it is necessary to do a good job of wall waterproofing before laying wall tiles, and the wall should be waterproof with a height of 30 cm in the general waterproof treatment, but for non-load-bearing light walls, the whole wall should be waterproofed, at least to be meters high.

    2. The groove of the water pipe in the bathroom wall is waterproof.

    It's a question that is easy to overlook.

    During the construction process, when pipelines and floor drains pass through the floor slab, the waterproof layer around the holes must be carefully constructed. The buried water pipe in the wall should be reasonably laid out, and the water pipe should be made with a groove larger than the pipe diameter, and the plastering in the groove should be smooth, and then the polyamide waterproof coating should be brushed in the groove.

    3. Ventilation in the bathroom.

    Moisture tends to accumulate in the bathroom, so ventilation is particularly crucial. It is best to choose a Mingwei with a window. If it is a secret guard, in order to be hygienic and not moldy, not hairy, and no tide insects crawling around, you can install an exhaust fan with high power and good performance.

    4. Bathroom light.

    The choice of bathroom lamps should choose lamps with soft light colors, which can make the bathroom look spacious and bright.

    5. Bathroom tiles.

    The choice of bathroom tiles, you can choose white or light tones, do not choose black or dark colors, especially for small space bathrooms, light colors can make the bathroom look spacious, will not make people feel cramped.

    6. Bathroom floor drain.

    The height of the floor drain seal should reach 50mm to prevent the air in the drainage pipe from flooding into the room. The floor drain should be about 10mm lower than the ground, and the drainage flow should not be too small, otherwise it is easy to cause blockage. If the floor drain is rough around it, it is easy to catch hair, sludge, cause blockage, and bacteria can easily multiply.

    The opening aperture of the floor drain grate should be controlled between 6 8mm, so as to effectively prevent hair, sludge, sand and other dirt from entering the floor drain.

Related questions
2 answers2024-05-17

There are a lot of big mosquitoes in the bathroom of the new house. >>>More

5 answers2024-05-17

It is estimated that you are using JS waterproof paint or waterproof mortar, the reason is that the ratio of emulsion and powder is not right, and the emulsion is used less. The second is that the quality of the acrylic emulsion is not good.

1 answers2024-05-17

At least two or three days. It is necessary to wait for the waterproof coating film to dry and pass the closed water acceptance before the follow-up construction can be carried out. Among them, the waterproof coating film is completely dry in about a day, and then a 24-48 hour closed water test is carried out to check whether there is leakage in the waterproof, and if there is no problem, the tile paving work can be carried out.

1 answers2024-05-17

The process is reversed, should be waterproofed first, so that the root of the encapsulated sewage pipe is a concave position, the ground grows taller, if there is stagnant water, there will be leakage here to the downstairs, if the ground has been waterproofed, the position of the encapsulation should be done again, as long as the surface is dry, it can be done.

5 answers2024-05-17

Theoretically, there is no problem, the construction process is to do a good job of waterproofing, and then do a closed water test, and then the base surface treatment, putty scraping, primer painting, and then topcoat. However, in reality, the general bathroom is more tiled after waterproofing, because the bathroom needs long-term water, and the indoor will be more humid and more water vapor, if it is painted, then the water vapor may still erode the paint on the wall, and then affect the beauty of the wall, so it is recommended to paste tiles better.