Which of the following options is NOT a common construction quality defect in ceiling works?

Updated on Suspended ceilings 2024-05-02
4 answers
  1. Anonymous users2024-01-23

    The common problems of exterior wall brick engineering are mainly hollowing, falling off and cracking. In order to control the emergence of these problems, it is necessary to standardize the construction, as follows:

    1. Prevent falling off, hollowing and cracks. During construction, the base must be cleaned, the surface repaired and smoothed, and the wall surface is soaked with water. Before the use of exterior wall tiles, they must be soaked in water for no less than 2 hours, and then taken out to dry before they can be pasted.

    The external wall brick adhesive mortar is too thick or too thin to produce hollowing, and the thickness is generally controlled to 7 10mm. If necessary, the 108 glue of cement quality 3 is mixed to improve the workability and water retention of the adhesive mortar; When bonding the exterior wall bricks, gently tap the brick surface with the ash spoon wooden handle to make it dense and firm with the bottom layer. During winter construction, anti-freezing and warmth measures should be taken to ensure that the mortar is not frozen.

    2. Prevent uneven seams and uneven seam widths. Before construction, carefully select the exterior wall tiles and remove the defective exterior wall tiles. Apply the same size exterior wall tiles on the same wall to achieve uniform joints.

    Do a good job of rules before pasting, paste ash cake with exterior wall bricks, draw out the standard, and wipe straight on both sides at the sunny corner. Each row of exterior wall tiles should be used in time to straighten horizontally and vertically, and the deviation should be gently knocked flat with an ash spoon wooden handle, and the horizontal and vertical joints should be corrected in time.

    3. After hooking or wiping the joints, the mortar and paint on the surface of the brick should be wiped with a rag or cotton yarn in time.

    4. When inlaying exterior wall facing bricks in summer, a ventilation pergola should be erected to prevent exposure to the sun and other reliable and effective measures should be taken.

    5. During the construction in winter, the use temperature of the mortar shall not be lower than 5, and anti-freezing and warmth measures should be taken before the mortar is hardened. Walls built with the freezing method should be defrosted before plastering.

  2. Anonymous users2024-01-22

    Options, I don't see pictures or text or anything like that.

  3. Anonymous users2024-01-21

    A: What about the following options? Please complete it. ‍

  4. Anonymous users2024-01-20

    13. Which of the following options does not belong to the common construction quality defects of ceiling projects. (A) The spacing between the booms is too small.

    B. Asymmetry of the block.

    C. Cracks and unevenness in the ceiling.

    D. The boom is not vertical and not rust-proof.

Related questions
1 answers2024-05-02

Toilet exhaust fans belong to plumbers who repair appliances, and you can ask them to help you.

4 answers2024-05-02

In general, the area of the ceiling is the floor area of the space being hoisted. Of course, there is a situation that occurs that there is only a part or a piece of ceiling in a large space, it is recommended to make a budget, according to the size and difficulty of your design, and then according to the cost of materials and labor according to the individual calculation.

2 answers2024-05-02

According to reports, the National Tourism Administration launched the "National All-for-One Tourism Holographic Information Service System" on the 5th. An important function of the system is to realize the navigation of all-for-one tourist toilets with the help of network map data and accurate positioning capabilities. The first phase will realize the navigation service of more than 500,000 social toilets and scenic toilets, and will gradually expand, so that users can easily find toilets in other urban areas outside the scenic spot. >>>More

3 answers2024-05-02

1.Hello, considering that it is caused by a urinary tract infection, it is recommended that you do a urine routine to check whether there is a possibility of urinary tract infection, or do a urine bacterial culture. >>>More

2 answers2024-05-02

Personally, I believe that this is not a question of revocation, but a question of pursuing liability for breach of contract. The statute of limitations is one year from the time when the right was known or should have been known. However, if more than 20 years have elapsed since the date on which the rights were infringed, the people's courts will not protect them. >>>More