Bought a house, high rise. When the room was pre closed, it was found that the cast in place floor s

Updated on Living room 2024-05-05
3 answers
  1. Anonymous users2024-01-23

    In fact, you shouldn't understand it so much, since the quality of the house meets the acceptance standards, there is no problem.

    In fact, the construction of the house itself is a process of construction, repair and maintenance, and the high-rise residences are all frame shear wall structures, and your floor slab should be fine after treatment.

    If you have to go, first find a real estate developer of Party A to protect your rights (probably basically the same as I said).

  2. Anonymous users2024-01-22

    If it does not meet the provisions of the purchase contract, you can change the house or deal with it as agreed.

  3. Anonymous users2024-01-21

    Find the real estate bureau to say, the details of the situation are clear

Related questions
2 answers2024-05-05

Hanging the face to look at the demon mirror, there is nothing wrong with anything else.

2 answers2024-05-05

If the developer changes the planning and design without notifying the owner, he can ask to move out.

3 answers2024-05-05

A long road facing the main door of your house can form what is known as a dark arrow. In order to counteract this harmful effect, you should hang a gossip mirror above the front door in the same way that the mirror mouth is outward. Because of the different places, directions and different placements, the time is also very important, the lunar calendar to choose the zodiac auspicious day does not rush to their own and your family's zodiac can be done, if you feel troublesome, it is recommended that you find an experienced feng shui expert nearby to deal with it!

4 answers2024-05-05

Hello, I don't think it's a very good feng shui, it's not good for the door, and it's not good to have a tree to block it, so if you care about this aspect, it's better not to choose!

4 answers2024-05-05

It's best not to do it yourself, because each house has a design load-bearing standard, if you pour another layer of reinforced concrete, it may damage the original load-bearing structure, and whether there is damage to the beam should also be considered. This should be done with the developer to see if the floor slab is too thin or some other problem (if there is a problem with the reinforcement, it will be a big trouble, because the reinforcement of beams and columns may also have the same problem), and this should be solved by the developer.