The waterproof cement in the bathroom does not solidify for two days

Updated on Bathroom 2024-05-08
1 answers
  1. Anonymous users2024-01-23

    Hello: The cement may not be of substandard quality. The cement has expired or failed, and the amount of concrete cement input is too small, etc., which will cause the cement to not solidify.

Related questions
2 answers2024-05-08

The newly solidified cement floor can choose CF-2000 high-efficiency composite waterproofing agent rigid waterproof material for waterproof construction. Other waterproof materials generally require waterproof construction when the water content of the concrete foundation is less than 5%, so as to ensure that the waterproof quality reaches a qualified level.

2 answers2024-05-08

It's okay to reverse the tideTry the water.

If you don't leak, you'll be fine. >>>More

2 answers2024-05-08

It is important to waterproof the bathroom. As long as there is water seepage, it must be done again. This is not ambiguous at all. Otherwise, it will be troublesome later. >>>More

2 answers2024-05-08

Your bathroom waterproofing is not done well, and water is still seeping for two days, which water pipe is not sealed well.

6 answers2024-05-08

Generally speaking, the first trimester of the fetus is more important, is the key time for the development of the nervous system, the decoration of the smell of pregnant women in the early pregnancy to avoid smelling, now the radiator to paint the heating pipe, should be coated with water-based paint, water-based paint is to use water as a diluent, no organic solvent coating, also known as water-based paint. However, the radiator is a product used at high temperature, and if it generally has little impact on home decoration, it is recommended not to spray paint the radiator pipe, in case the selected paint material is not good and emits smelly gas. >>>More