Can you still install a lifting drying rack with an integrated ceiling for decorating a balcony?

Updated on Balcony 2024-05-02
2 answers
  1. Anonymous users2024-01-23

    That's okay, you can look at the pictures.

  2. Anonymous users2024-01-22

    It is possible to install a drying rack first and then a suspended ceiling.

Related questions
12 answers2024-05-02

There is no conflict between the installation of the integrated ceiling and the lifting hanger, as long as the lifting is not installed on the ceiling.

6 answers2024-05-02

Yes, it's just that an integrated ceiling will get in the way. >>>More

3 answers2024-05-02

Properly handle the installation of balcony ceilings and balcony drying racks, and install drying racks before hanging ceilings. >>>More

4 answers2024-05-02

Before the ceiling, first reinforce it with a woodworking board at the corresponding position where you want to install the hanger, and then screw the screws on that position after the installation of the integrated ceiling is completed.

5 answers2024-05-02

Yes, it doesn't affect it, and talk about it with the installation of lifting hangers, because the quality of some workers is poor, and they will destroy your ceiling by punching holes, and if they are discussed, the workers will be very small and will be very regular, so that there is no damage. >>>More