I bought a rough house to prepare to close the building, to try the bathroom for leakage, but the do

Updated on Bathroom 2024-05-17
3 answers
  1. Anonymous users2024-01-24

    To buy a rough house to decorate the bathroom, you must first do a good job of waterproofing, and then try to see if there is any leakage. It is not possible to ask you to test the leak first and then consider whether to make it waterproof. This is a rule that no one can break.

  2. Anonymous users2024-01-23

    Just talk to the property and let the property coordinate.

  3. Anonymous users2024-01-22

    Talk to the property to see if it can be adjusted, if it can't be adjusted, then explain it to the owner downstairs, if you really accidentally leak in the future, don't look for your responsibility when you bring it.

Related questions
4 answers2024-05-17

It can be changed, add an elbow to the ground and change it as far as you want, and then build a platform with bricks.

2 answers2024-05-17

Because the photo is too small and pasty, it is even more mushy when I zoom in, so I can only guess: the three short thick pipes seem to be drainage pipes.

6 answers2024-05-17

If you buy a clear water house, then the developer has done waterproofing when handing over the house, it is recommended to do a 48-72 hour closed water test when receiving the house to check whether there is a problem with the waterproofing. >>>More

6 answers2024-05-17

In the decoration process, the waterproof construction of the bathroom is a very critical step, because the water consumption of the bathroom is the most used place in the house, if the waterproofing is not done well, it will bring great inconvenience to the owner after moving in. Do the base leveling. Use polyurethanes, C, polymers, cement mortars, etc., similar to paints, when brushing waterproof for the first time. >>>More

2 answers2024-05-17

The standard floor drain is a 10*10 panel with 50 pipes, and the height from the floor drain mouth to the sewer pipe is not less than eight cm. >>>More