Anti compact board sanitary partition according to the installation steps

Updated on Bathroom 2024-05-05
1 answers
  1. Anonymous users2024-01-23

    Hello. In fact, the installation of sanitary partitions is far less complicated than we imagined, it is not like home decoration toilets, there are many and complex procedures. The steps for installing the sanitary partition are as follows:

    1. First of all, we measure several data of the bathroom, which are the total width, height, depth and door width of the sanitary partition, and draw a sketch and mark it after measurement.

    2. We draw a sketch and mark the data to provide to the plate supplier you consult, then they will design a 3D rendering for us to see, and will also make a standard floor plan installation drawing according to the data we give. In addition, they will directly process the size of the plate according to the data, and we don't need to cut and measure, we just need to install it according to the flat installation plan.

    3. At this time, when the formal installation is carried out, we need to punch holes and install the support feet according to the plane installation drawing, install the corner code of the fixed partition plate (that is, the partition plate between the two squatting positions) on the wall, and close the depth plate according to the corner code and the support foot, and then tighten the screws in turn to completely fix it.

    4. After fixing the partition board, we will start on the panel (the connecting plate of the partition plate and the door panel), the corner code is first fixed at one end of the partition board, and the panel is closed according to the corner code, tighten the screws, and then the partition plate and the panel are fixed, and only the last step remains.

    5. The last step is to fix the hinge on the panel first, align the door panel according to the hinge, and then tighten the screws. Then install the doorknob and check that the bathroom is installed using such a simple and beautiful bathroom.

    6. After installation, clean and use normally.

    Hope it helps.

Related questions
2 answers2024-05-05

Sanitary partition board is generally used single-layer particle board or ecological board or other boards, there is no need to sandwich wood in the middle.

3 answers2024-05-05

Sliding doors (sky rail + ground rail + sliding door).

Partition curtain (hanging rail + curtain). >>>More

1 answers2024-05-05

Step 1: Install the fixing plate.

Find a suitable position on the wall to draw the center line of the fixing piece, see how many screw holes are fixed on the fixing plate, and then punch a few holes on the center line of the wall, put the plastic race sleeve into the hole, and then use the expansion wire to fix the fixing plate on the wall. >>>More

4 answers2024-05-05

Ordinary plates cost 20 yuan per square meter, and anti-compact waterproof board requires 31 square meters of labor.

4 answers2024-05-05

point, like man-made panels, has a higher cost, is suitable for wet environments, and has high requirements for fire rating.