After the bathroom water seepage test, the cement floor and wall will dry completely after a few day

Updated on Bathroom 2024-05-03
1 answers
  1. Anonymous users2024-01-23

    This depends on the region and season, for the northern or inland dry areas, the humidity season is low, generally 4 to 6 days, and for the southern or coastal areas of the rainy season, it takes 7 to 15 days.

Related questions
3 answers2024-05-03

The toilet waterproofing layer is damaged and must be treated. The sand used in cement is not pure river sand, and it is alkaline when exposed to water. Do anti-alkali treatment and repair the waterproof layer, usually when laying the plumbing pipe, the door is overtreated improperly or the doorway waterproofing is not excessive to the bedroom. Construction quality issues.

5 answers2024-05-03

You don't have to. For home decoration, the paving of wall and floor tiles is generally carried out after passing the waterproof closed water test. When laying floor tiles, the dry ash layer under the bricks can be used as a protective cushion for the waterproof layer. >>>More

1 answers2024-05-03

The main reason is that the wall is not waterproof, most of the tile joints have penetrated into the past, you can find the nano permeable waterproofing agent of Youpadun company, paint on the surface, paint twice, you can achieve the effect of waterproofing.

16 answers2024-05-03

The bathroom wall is leaking, and you need to do a good job of waterproofing the bathroom wall!

10 answers2024-05-03

It's not that the waterproof is not good, but the water is stored in the waterproof layer, and there is a role of water diversion to make the two bedrooms seepage at the same time, make the waterproof layer a little higher so that the water can be smoothly removed from the floor drain and toilet outlet, and it will solve your problem, and the waterproof around it will be a little higher.