The bathroom on the second floor was renovated to remove the load bearing wall, and the sewage pipe

Updated on Bathroom 2024-05-27
1 answers
  1. Anonymous users2024-01-24

    The cost is borne by you, because the junction between the third and second floors is not leaky, because you have to make other changes to cause a certain amount of leakage, so people are not responsible. Of course, you can also negotiate, if you can, you can use Golga waterproof paint to redo it, I also use this.

Related questions
2 answers2024-05-27

The bathroom generally does not have a load-bearing wall, and the ordinary partition wall will not affect the change position.

1 answers2024-05-27

There is no problem with load bearing. The key is that the channel steel is dismantled and installed steadily, and is in close contact with the wall and roof.

2 answers2024-05-27

How big is the opening?

If it is not big, it will not affect the whole structure, if it is larger than 30 * 30 cm, it will be reinforced. >>>More

1 answers2024-05-27

Not really.

The same needs to be reinforced. >>>More

2 answers2024-05-27

The weight of the electric water heater is about 20 kg, and it is about 60 kg after filling with water, and the general wall can be hung up.