The interior door is not done in the floor plan of the building part of the construction drawing, an

Updated on Inner door 2024-05-01
1 answers
  1. Anonymous users2024-01-23

    Doors and windows are the main components of the building, and the main components of the building are not constructed, so it is not finished, and the unfinished project does not meet the conditions for the production of as-built drawings!

    It's a laughable thing: it's not right to delete, how can it be deleted without a formal change notice? It's not right not to delete, how can the door be drawn on the as-built drawing if it is not finished?

Related questions
1 answers2024-05-01

The main floor plan of the main building also uses a maximum scale of 1 500 or more, i.e. a balcony of 1 metre, which is only 2 mm on the drawing. When a large range of 1 2000 is used, it simply does not behave.

1 answers2024-05-01

What is the KG marked in the kitchen location in the construction drawings? This is a reserved hole.

2 answers2024-05-01

In the 1:100 building plan, the actual length of 1 meter is only 1 cm in the drawing, and some of the outlines that are actually only a few centimeters thick are less than 1 mm in the drawing, which cannot be clearly represented in 1:100. >>>More

2 answers2024-05-01

Balconies are also represented by lines.

10 answers2024-05-01

Summary. It refers to the reserved size of the width structure of the door opening, and the height is also the size before the decoration of the floor, I hope it will help you. >>>More