Is the bathroom ceiling before the sliding door shower?

Updated on Bathroom 2024-05-20
3 answers
  1. Anonymous users2024-01-24

    The bathroom ceiling is in front of the jade screen in front of Lamen'er.

  2. Anonymous users2024-01-23

    Yes, the ceiling is generally the first to be done and then the sliding door is done. Jade screen or something.

  3. Anonymous users2024-01-22

    Bathroom ceilings are usually the entire bathroom ceiling.

Related questions
4 answers2024-05-20

First of all, let's take a look at the pros and cons of installing a bathroom bath screen: Pros: Independent bathing space (do not install an integral bath room), water will not splash outside the bath screen, and it feels high-end! >>>More

1 answers2024-05-20

It is good with a shower curtain.

When not in use, it can be put away without occupying toilet space. >>>More

1 answers2024-05-20

First of all, pry the floor tiles open, find out the location of water seepage, and paint a high-flexibility waterproof coating at the location of water seepage, which has toughness and is not afraid of water pressure.

2 answers2024-05-20

If there are stains on the surface of the glass and aluminum in the shower room, you can wipe it with a neutral detergent such as dish soap after dissolving the water; It is best to use a soft, dry cloth for ordinary cleaning to avoid scratching the glass; Do not use acidic or alkaline solvents, chemicals (such as hydrochloric acid), acetone diluent and other solvents, decontamination powder, etc. to clean the shower room, otherwise it will have a negative effect on people and the shower room. >>>More

1 answers2024-05-20

Remodel the restroom yourself;

It can be pushed to rebuild a larger one and then install the bath screen. >>>More